Showing 41 - 60 results of 66 for search 'Chiew, Sing Ping.', query time: 0.03s
Refine Results
-
41
Building of small bamboo shelter : basic material properties by Su, Shiquan.
Published 2010Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
42
Building of small shelter using steel cold-formed lipped channel : connection design by Toh, Yao Kwang.
Published 2010Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
43
Building of small shelter using steel cold-formed lipped channel : shelter design and members behaviour by Quek, Jia Wei.
Published 2010Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
44
Building of small shelter using steel cold-formed lipped channel : shelter design and members behaviour by Chong, Shin Leng.
Published 2010Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
45
Model and mesh generation of partially overlapped circular hollow section k-joints for fatigue studies by Nguyen, Thi Bich Ngoc
Published 2010Other Authors: “…Chiew Sing Ping…”
Thesis -
46
Behavior of hollow steel stub-columns in-filled with green concrete incorporating ground granulated blastfurnace slag (GGBS) by Lam, Sai Mun
Published 2011Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
47
Green building and its carbon footprint by Lee, Wei Liang.
Published 2011Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
48
An experimental investigation on longitudinal shear of composite slab based on eurocode 4 by Mok, Eugene Kai Boon.
Published 2012Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
49
Experimental investigations on composite slabs : punching shear, vertical shear and flexural failure by Lai, Liyue
Published 2012Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
50
Experimental investigation on longitudinal shear of composite slab based on BS5950 1994 : part 4 by Tay, Poh Chien.
Published 2012Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
51
Experimental investigation on composite slabs - punching, flexural and vertical shear failure by Lee, Cailin.
Published 2012Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
52
Behavior of cold formed steel sheet piles by Liu, Qiaoxia.
Published 2013Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
53
Longitudinal shear behaviour in composite slab with profiled steel decking by Ang, Yi Wen
Published 2013Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
54
Behavior of cold-formed steel sheet piles by Hazwani Tubah.
Published 2013Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
55
Development of a new steel profile deck for composite floor system by Lim, Jia Ying.
Published 2013Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
56
Development of a new steel profile deck for composite floor system (construction stage) by Tan, Lai Hui.
Published 2013Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
57
ST-36AB : post weld heat treatment (PWHT) of thermo mechanical controlled process (TMCP) steel plates by Png, Zhi Sheng
Published 2014Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
58
Post weld heat treatment of thermo-mechanical controlled process steel plates by Chin, Wan Ling
Published 2014Other Authors: “…Chiew, Sing Ping…”
Final Year Project (FYP) -
59
Response of ultra-high strength quenched and tempered steel plates to heat by Azfar Sa'ad
Published 2014Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP) -
60
ST-23AB : A modular system for prefabricated pre-finished volumetric construction (PPVC) - joint behaviour by Yang, Jocelyn Yun Xuan
Published 2015Other Authors: “…Chiew Sing Ping…”
Final Year Project (FYP)