Showing 1 - 20 results of 60 for search 'Michael W. Golay.', query time: 0.03s
Refine Results
-
1
Identifying and influencing the essential elements of stakeholder engagement leading to the success of socially controversial projects by Walsh, David M. (David Michael)
Published 2017Other Authors: “…Michael W. Golay.…”
Thesis -
2
Challenges in creating online courses and establishing a measure of their efficacy with an example of MIT's course in Sustainable Energy by Srivastava, Amrita, S.M. Massachusetts Institute of Technology
Published 2017Other Authors: “…Michael W. Golay.…”
Thesis -
3
Models for stakeholder relationship management at socially controversial facilities by Laws, Adrien (Adrien James)
Published 2017Other Authors: “…Michael W. Golay.…”
Thesis -
4
Stakeholder relationship management in controversial projects : a case study of the Cape Wind Project using a feedback analysis model by Luque, Sebastián (Luque Holtheuer)
Published 2017Other Authors: “…Michael W. Golay.…”
Thesis -
5
An integrated formal approach for developing reliable software of safety-critical system by Ouyang, Meng
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
6
The dependence of human reliability upon task information content by Hermanson, Eric M. (Eric Michael)
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
7
Challenges and strategies for increasing adoption of renewable energy in the MENA region by Zureikat, Yazeed Abdullah Ghanem.
Published 2019Other Authors: “…Michael W. Golay.…”
Thesis -
8
A framework for analyzing nuclear power multiunit accident scenarios and providing accident mitigation and site improvement suggestions by Cai, Yinan,Ph. D.Massachusetts Institute of Technology.
Published 2020Other Authors: “…Michael W. Golay.…”
Thesis -
9
Improved methods for managing megaprojects by Minelli, Paolo,Ph. D.Massachusetts Institute of Technology.
Published 2021Other Authors: “…Michael W. Golay.…”
Thesis -
10
Droplet generator by Ward, Mary Elizabeth
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
11
Probabilistic accident analysis of the Pebble Bed modular Reactor for use with risk informed regulation by Savkina, Marina D., 1973-
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
12
Framework for risk informed performance based regulation for nuclear power plants by Abdelkader, Sarah Ali
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
13
Reliability quantification of nuclear safety-related software by Zhang, Yi
Published 2005Other Authors: “…Michael W. Golay.…”
Thesis -
14
Development of a hybrid intelligent system for on-line real-time monitoring of nuclear power plant operations by Yildiz, Bilge
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
15
Bayesian Belief Network (BBN)-based advisory system development for steam generator replacement project management by Kim, Dohyoung, 1970-
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
16
Using risk-based regulations for licensing nuclear power plants : case study of gas-cooled fast reactor by Jourdan, Grégoire
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
17
Identification and resolution of problems with methodology used in selection of technological concepts for R&D support by Hardman, William L
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
18
Use of combined signals for reactor shutdown signal validation by Lin, Junne Lung
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
19
Verification and validation of safety related software by Arno, Matthew G. (Matthew Gordon)
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis -
20
Criteria for assessing the quality of nuclear probabilistic risk assessments by Zhu, Yingli, 1976-
Published 2006Other Authors: “…Michael W. Golay.…”
Thesis