Showing 1 - 20 results of 21 for search 'Zhongren Wang', query time: 0.78s
Refine Results
-
1
The Sight Distance Issues with Retrofitted Single-Lane HOV Facilities by Zhongren Wang
Published 2013-06-01
Article -
2
-
3
Queue Storage Design for Metered On-Ramps by Zhongren Wang
Published 2013-03-01
Article -
4
Determination of Onramp Weaving Length for Resolving Merging Dilemma by Chiu Liu, Zhongren Wang
Published 2012-03-01
Article -
5
-
6
Implementing a pavement management system: The Caltrans experience by Zhongren Wang, Tom Pyle
Published 2019-09-01
Article -
7
A Discussion on the Current MUTCD Standards on Traffic Control Signals for Freeway Entrance Ramps by Zhongren Wang, Vinh Dang
Published 2012-03-01
Article -
8
An Evaluation of Ramp Control Signal Head Placement Based on Motorist's Cone of Visions by Zhongren Wang, Hiep Nguyen
Published 2014-09-01
Article -
9
-
10
Truck acceleration behavior study and acceleration lane length recommendations for metered on-ramps by Guangchuan Yang, Hao Xu, Zhongren Wang, Zong Tian
Published 2016-10-01
Article -
11
A Comparison of Floating Car vs. Loop Detector Estimated Freeway Travel Time Delay by Zhongren Wang, Ph.D. P.E. T.E.
Published 2012-06-01
Article -
12
-
13
Coordinated Ramp Metering and Intersection Signal Control by Dongyan Su, Xiao-Yun Lu, Roberto Horowitz, Zhongren Wang
Published 2014-06-01
Article -
14
The Weaving Length Limit for Short Free Onramps by Chiu Liu, PhD, PE, PTOE, Zhongren Wang, PhD, PE, TE
Published 2013-09-01
Article -
15
Ramp Metering Influence on Freeway Operational Safety near On-ramp Exits by Chiu Liu, PhD, PE, PTOE, Zhongren Wang, PhD, PE, TE
Published 2013-06-01
Article -
16
Estimate Freeway Exit Sign Locations by Chiu Liu, PhD, PE, PTOE, Zhongren Wang, PhD, PE, TE
Published 2013-03-01
Article -
17
-
18
-
19
-
20
The Minimum Yellow Timing for Ramp Meters by Zhongren Wang, PhD, PE, TE, Chiu Liu, PhD, PE, TE, PTOE, F. ASCE
Published 2014-12-01
Article