Pre-production cost savings-planning and tooling/
22
Main Authors: | 234247 Eldred, A. H., Annual Conference (2nd : 1972 : Whately Hall, Banbury) |
---|---|
Format: | |
Published: |
London : Institution of Production Engineers,
1974
|
Subjects: |
Similar Items
-
Medium to heavy engineering/
by: 243982 Caudwell, F. W., et al.
Published: (1974) -
Implementation of group technology /
by: 234247 Eldred, A. H.
Published: (1974) -
Hybrid Product Cost Calculation Model as a Decision Support Tool
by: Stevan Perovic, et al.
Published: (2022-01-01) -
Payment systems/
by: 393063 Sawyer, J. H. F., et al.
Published: (1974) -
INDUSTRY COST PLANNING FEATURES WITH PRE-PRODUCTION MEDICAL EQUIPMENT AND MACHINERY
by: E. Shapoval, et al.
Published: (2016-12-01)