Pile driving construction control by the case method /
08
Main Author: | |
---|---|
Format: | |
Language: | eng |
Subjects: |
_version_ | 1796697380552179712 |
---|---|
author | Gravare, C. J. |
author_facet | Gravare, C. J. |
author_sort | Gravare, C. J. |
collection | OCEAN |
description | 08 |
first_indexed | 2024-03-05T01:17:49Z |
format | |
id | KOHA-OAI-TEST:256139 |
institution | Universiti Teknologi Malaysia - OCEAN |
language | eng |
last_indexed | 2024-03-05T01:17:49Z |
record_format | dspace |
spelling | KOHA-OAI-TEST:2561392020-12-19T17:08:04ZPile driving construction control by the case method / Gravare, C. J. eng08PSZJBLPiling (Civil engineering) |
spellingShingle | Piling (Civil engineering) Gravare, C. J. Pile driving construction control by the case method / |
title | Pile driving construction control by the case method / |
title_full | Pile driving construction control by the case method / |
title_fullStr | Pile driving construction control by the case method / |
title_full_unstemmed | Pile driving construction control by the case method / |
title_short | Pile driving construction control by the case method / |
title_sort | pile driving construction control by the case method |
topic | Piling (Civil engineering) |
work_keys_str_mv | AT gravarecj piledrivingconstructioncontrolbythecasemethod |