Behaviour during construction of a propped diaphragm wall in stiff clay at Walthamstow /
08
Main Authors: | 372951 Carder, D. R., Transport Research Laboratory (Great Britain) |
---|---|
Format: | |
Published: |
Crowthorne, Eng. : TRL,
1994
|
Subjects: |
Similar Items
-
Behaviour during construction of a propped diaphragm wall in stiff clay at the A406/A10 junction/
by: 372951 Carder, D. R., et al.
Published: (1991) -
Behaviour during construction of a propped contiguous bored pile wall in stiff clay at Walthamstow /
by: 425651 Carswell, I., et al.
Published: (1993) -
Long term performance of an archored diaphragm wall embedded in stiff clay/
by: 373176 Carswell, I. G., et al.
Published: (1991) -
Behaviour of the diaphragm wall of a cut-and-cover tunnel constructed in boulder clay at Fenchley /
by: 372740 Brookes, A. H., et al.
Published: (1996) -
Behaviour during construction of a propped secant pile wall in stiff clay at Hackney to M11 link /
by: 372722 Bennett, S. N., et al.
Published: (1996)