The construction and simulation of sag and tension calculation for 275/132 kV overhead transmission line /
Project paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1997
Main Author: | 298302 Goh, Yin Seng |
---|---|
Format: | |
Published: |
Sekudai : UTM,
1997
|
Subjects: |
Similar Items
-
The construction and simulation of sag & tension calculation for 275/132 kV overhead transmission line ... [et al.] / [microfilm]
by: 298302 Goh, Yin Seng, et al.
Published: (1997) -
Development transmission line : Sag and Tension Calculation (Rate 275KV and 500KV) /
by: 194234 Iskandar Reduan
Published: (2005) -
Lighting performance study on existing 275KV overhead line in TNB system /
by: Muralitharan Thamodharan, 1974-, et al.
Published: (2013) -
Sag and Tension of 275 kV Transmission Line using Catenary
by: Dicky Novriandi, et al.
Published: (2019-10-01) -
Lighting performance study on existing 275KV overhead line in TNB system [electronic resource] /
by: Muralitharan Thamodharan, 1974-