Simulation of tasks in bridge construction [electronic resource] /
Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009
Main Authors: | Basheer Abdul Wareth Mohammed Mohammed, 1978-, Fakulti Kejuruteraan Awam |
---|---|
Format: | |
Language: | eng |
Published: |
2009
|
Subjects: |
Similar Items
-
Simulation of tasks in bridge construction /
by: Basheer Abdul Wareth Mohammed Mohammed, 1978-, et al.
Published: (2009) -
Buildability in bridge construction [electronic resource] : case study of Sungai Johor cable-stayed bridge /
by: Mardiyah Zahidi, 1986-, et al.
Published: (2009) -
Maintenance factors in elevated highway bridge design [electronic resource] /
by: 253017 Nurfaiza Akmal Mat, et al.
Published: (2009) -
Construction sequence analysis of balanced cantilever bridge [electronic resource] /
by: Muhammad Hafiz Idris, 1992-, author 609279, et al.
Published: (2016) -
Risk management of bridge construction project in Indonesia [electronic resource] /
by: Rakhma Destrian Adi Mahardika, 1978-
Published: (2012)