Direct loss and expense relating to remoteness of damages /
Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006
1. autor: | 441250 Lee, Xia Sheng |
---|---|
Format: | |
Język: | eng |
Wydane: |
Skudai : Universiti Teknologi Malaysia,
2006
|
Hasła przedmiotowe: | |
Dostęp online: | http://www.psz.utm.my/sla/billing/login.asp?mid=37069 |
Podobne zapisy
-
Direct loss and expense relating to remoteness of damages
od: Lee, Xia Sheng
Wydane: (2006) -
The extension of time award in relation to direct loss and or expense claim /
od: 225989 Muhammad Zahid Mardzuki
Wydane: (2008) -
Remoteness of damage in breach of contract /
od: W. Mohd. Haniff W. Mohd. Shaupil, 1977-, i wsp.
Wydane: (2008) -
Liquidated and ascertained damage (LAD) and requirements of mitigation /
od: 280249 Yong, Mei Lee
Wydane: (2006) -
A study on section 75 of contracts act 1950: essentiality of proving 'actual loss' in effectuating construction liquidated damages clause / Akmyr Ahmad Azwan Abdul Kadir …[et al.]
od: Abdul Kadir, Akmyr Ahmad Azwan, i wsp.
Wydane: (2014)