Dokumen kontrak : design and build of a substation complete with installation, testing and commissioning of gas insulated switchgear system for Universiti Teknologi Malaysia, Skudai, Johor /

Vol. 1. Others installation details -- v. 2. 22KV gas insulated switchgear -- v. 3. Remote control panel (RCP) -- v. 4. pt. 1. Scada Control System (SCS) -- v.4. pt. 2. Scada Control System (SCS) -- v. 5. As-built drawings

Podrobná bibliografie
Hlavní autoři: Universiti Teknologi Malaysia, Kejuruteraan Elektrik Zamani
Médium:
Jazyk:eng
Vydáno: Skudai : Universiti Teknologi Malaysia, 1999
Témata: