The study to optimize the payback period for PV installation in Malaysia /
Thesis (Sarjana Kejuruteraan (Elektrik - Kuasa)) - Universiti Teknologi Malaysia, 2009
Main Authors: | , , |
---|---|
Format: | |
Language: | eng |
Published: |
2009
|
Subjects: |
_version_ | 1796734250214490112 |
---|---|
author | Mohammad Shahril Ardianshah, 1984- Zainal Salam, supervisor Fakulti Kejuruteraan Elektrik |
author_facet | Mohammad Shahril Ardianshah, 1984- Zainal Salam, supervisor Fakulti Kejuruteraan Elektrik |
author_sort | Mohammad Shahril Ardianshah, 1984- |
collection | OCEAN |
description | Thesis (Sarjana Kejuruteraan (Elektrik - Kuasa)) - Universiti Teknologi Malaysia, 2009 |
first_indexed | 2024-03-05T10:04:15Z |
format | |
id | KOHA-OAI-TEST:431498 |
institution | Universiti Teknologi Malaysia - OCEAN |
language | eng |
last_indexed | 2024-03-05T10:04:15Z |
publishDate | 2009 |
record_format | dspace |
spelling | KOHA-OAI-TEST:4314982020-12-19T17:15:26ZThe study to optimize the payback period for PV installation in Malaysia / Mohammad Shahril Ardianshah, 1984- Zainal Salam, supervisor Fakulti Kejuruteraan Elektrik 2009engThesis (Sarjana Kejuruteraan (Elektrik - Kuasa)) - Universiti Teknologi Malaysia, 2009FEELECTLPhotovoltaic power systems |
spellingShingle | Photovoltaic power systems Mohammad Shahril Ardianshah, 1984- Zainal Salam, supervisor Fakulti Kejuruteraan Elektrik The study to optimize the payback period for PV installation in Malaysia / |
title | The study to optimize the payback period for PV installation in Malaysia / |
title_full | The study to optimize the payback period for PV installation in Malaysia / |
title_fullStr | The study to optimize the payback period for PV installation in Malaysia / |
title_full_unstemmed | The study to optimize the payback period for PV installation in Malaysia / |
title_short | The study to optimize the payback period for PV installation in Malaysia / |
title_sort | study to optimize the payback period for pv installation in malaysia |
topic | Photovoltaic power systems |
work_keys_str_mv | AT mohammadshahrilardianshah1984 thestudytooptimizethepaybackperiodforpvinstallationinmalaysia AT zainalsalamsupervisor thestudytooptimizethepaybackperiodforpvinstallationinmalaysia AT fakultikejuruteraanelektrik thestudytooptimizethepaybackperiodforpvinstallationinmalaysia AT mohammadshahrilardianshah1984 studytooptimizethepaybackperiodforpvinstallationinmalaysia AT zainalsalamsupervisor studytooptimizethepaybackperiodforpvinstallationinmalaysia AT fakultikejuruteraanelektrik studytooptimizethepaybackperiodforpvinstallationinmalaysia |