Assembly line improvement by using industrial engineering (JE) tools and witness simulation [electronic resource] /
Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2010
Główni autorzy: | Ng, Mui Hui, 1988-, Wong, Kuan Yew, supervisor, Fakulti Kejuruteraan Mekanikal |
---|---|
Format: | |
Język: | eng |
Wydane: |
2010
|
Hasła przedmiotowe: |
Podobne zapisy
-
Assembly line improvement by using industrial engineering (JE) tools and witness simulation /
od: Ng, Mui Hui, 1988-, i wsp.
Wydane: (2010) -
Redesign of an assembly line through line balancing and simulation /
od: Tan, Li Pin, 1988-, i wsp.
Wydane: (2012) -
Simulation of air-conditioner assembly line & line balancing at Matsushita Industrial Corporation Sdn Bhd /
od: 373318 Lee, Yew Meng
Wydane: (1992) -
Productivity impovement of PCB assembly line through simulation /
od: 423898 Loh, Chee Yeh, i wsp.
Wydane: (2007) -
Redesign of an assembly line through line balancing and simulation [electronic resources] /
od: Tan, Li Pin, 1988-, i wsp.
Wydane: (2012)