Cost comparison between conventional method and industrialized building system (Prefabricated frame structure) /
Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2012
Main Authors: | Norhidayah Zakariya, 1985-, author, Azhar Ahmad, supervisor, Fakulti Kejuruteraan Awam |
---|---|
Format: | |
Language: | a |
Published: |
2012
|
Subjects: |
Similar Items
-
Cost comparison between conventional method and industrialized building system (Prefabricated frame structure) [electronic resource] /
by: Norhidayah Zakariya, 1985-, author
Published: (2012) -
Life cycle costing of industrialized building system and conventional building system /
by: Al-Attabi, Ali Mohammed Ali Naji, 1982-, et al.
Published: (2014) -
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling /
by: Amir Faghirinejadfard, 1980- author, et al.
Published: (2014) -
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling [electronic resource] /
by: Amir Faghirinejadfard, 1980- author, et al.
Published: (2014) -
Building time comparison between conventional and industrialized building system using schedule simulation /
by: Mohammad Mahdi Tahmasebi, 1986-, et al.
Published: (2012)