Application of dependancy structure matrix model in FPSO e-house module fabrication scheduling [electronic resource] /
Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Teknologi Marin)) - Universiti Teknologi Malaysia, 2014
Main Author: | Norhaziyah Afiqah Ahmad, 1990-, author |
---|---|
Format: | |
Language: | eng |
Published: |
2014
|
Subjects: |
Similar Items
-
Application of dependancy structure matrix model in FPSO e-house module fabrication scheduling /
by: Norhaziyah Afiqah Ahmad, 1990-, author, et al.
Published: (2014) -
Scheduling evaluation of FPSO e-house fabrication using by dependency structure matrix analysis /
by: Mohamad Hafidz Efendy, 1977-, author 606634
Published: (2016) -
Scheduling evaluation of FPSO e-house fabrication using by dependency structure matrix analysis /
by: Mohamad Hafidz Efendy, 1977-, author 606634, et al.
Published: (2016) -
Analisis penggredan skim perlindungan pada sistem gelang [electronic resource] /
by: 237021 Abdul Aziz Hussin, et al.
Published: (2007) -
Fuzzy neural network for fault detection on transmission line [electronic resource] /
by: 238411 Azrur Izwan Zulkarnain, et al.
Published: (2007)