Application of dependancy structure matrix model in FPSO e-house module fabrication scheduling /
Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Teknologi Marin)) - Universiti Teknologi Malaysia, 2014
Main Authors: | Norhaziyah Afiqah Ahmad, 1990-, author, Jaswar, supervisor, Fakulti Kejuruteraan Mekanikal |
---|---|
Format: | |
Language: | eng |
Published: |
2014
|
Subjects: |
Similar Items
-
Application of dependancy structure matrix model in FPSO e-house module fabrication scheduling [electronic resource] /
by: Norhaziyah Afiqah Ahmad, 1990-, author
Published: (2014) -
Scheduling evaluation of FPSO e-house fabrication using by dependency structure matrix analysis /
by: Mohamad Hafidz Efendy, 1977-, author 606634, et al.
Published: (2016) -
Scheduling evaluation of FPSO e-house fabrication using by dependency structure matrix analysis /
by: Mohamad Hafidz Efendy, 1977-, author 606634
Published: (2016) -
Planning of floating production storage offloading (FPSO) fabrication using dependency structure matrix (DSM) model /
by: Muhamad Firdaus Ismail, 1992- author, et al.
Published: (2017) -
Planning of floating production storage offloading (FPSO) fabrication using dependency structure matrix (DSM) model /
by: Muhamad Firdaus Ismail, 1992-, author, et al.
Published: (2017)