Ground imrpovement on land reclamation project- prefabricated vertical drain with pre-loading /
Main Authors: | Lee, Yoon Leong, 1991-, author 650237, Norhaya Ahmadi, supervisor 631403, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam 619085 |
---|---|
Format: | text |
Language: | eng |
Published: |
Johor Bahru, Johor : Universiti Teknologi Malaysia,
2020
|
Similar Items
-
Ground imrpovement on land reclamation project- prefabricated vertical drain with pre-loading /
by: Lee, Yoon Leong, 1991-, author 650237
Published: (2020) -
Ground improvement on land reclamation project-prefabricated vertical drain with pre-loading
by: Lee, Yoon Leong
Published: (2020) -
Back analyses on prefabricated vertical drain treated ground using plaxis 2D /
by: Hanisah Harun, 1989-, author 627335, et al.
Published: (2017) -
Soft ground improvement by prefabricated vertical drain (PVD) /
by: Nor Aisah Khalid, 1989-, author 620782, et al.
Published: (2018) -
Assessment of ground improvement work on soft ground using prefabricated vertical drain with surcharging /
by: Lee, Ann Chze, 1991-, author, et al.
Published: (2017)