Application of network analysis, resource scheduling and cost analysis in the selection of the optimum work schedule for the production of trommels in a factory/
Many engineering tasks or sequence of tasks can be carried out in more than one way. This gives rise to a range of feasible work schedules, each with its own distinctive working order, resource scheduling and inevitably, different sets of cost implications. The production of teommels in a factory (S...
Main Author: | 424302 How, Meng Git |
---|---|
Format: | |
Published: |
Sekudai: UTM,
1993
|
Subjects: |
Similar Items
-
Faster construction projects with CPM scheduling /
by: 341438 Woolf, Murray B.
Published: (2007) -
Construction project scheduling /
by: 353991 Callahan, Michael T., et al.
Published: (1992) -
Kajian perbandingan kebisingan pembakaran enjin disel menggunakan bahanapi gantian dan bahanapi disel konvensional; The effect of cyclic variation in combustion pressure and heat release in D I diesel engine; Merekebentuk dan fabrikasi acuan ansur; Pengujian prestasi pendesak pam empar yang di perbuat daripada aduanan getah asli; Kajian meramal daya seret ke atas peluru berpandu; An application of CAD/CAM in air pollution control system; Application of network analysis, resource scheduling and cost analysis in the selection of the optimum work schedule for the production of trommels in a factory; Merekebentuk membuat dan menguji alat pegering hasil pertanian - kaedah longwave infrared heater; Merekabentuk dan membina sebuah pencengkam robot 3 - jari / [mikrofilem]
by: Hairozaman Zaini, et al.
Published: (1993) -
Scheduling task systems with resources.
by: Lloyd, Errol Lynn
Published: (2006) -
The critical path : network analysis and resource scheduling /
by: 392599 Reynaud, C. B.
Published: (1967)