Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex

In recent years, there are rapid developments of shopping complex to fulfil the urban lifestyle. Based on the traffic impact assessment (TIA) practice, a shopping complex provides a parking space to meet the parking demand. However there is difficulty to obtain parking especially during noon at s...

Full description

Bibliographic Details
Main Author: Nurulain, Roslan
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/10102/1/NURULAIN%20BINTI%20ROSLAN%20%23.PDF
_version_ 1796990735301476352
author Nurulain, Roslan
author_facet Nurulain, Roslan
author_sort Nurulain, Roslan
collection UMP
description In recent years, there are rapid developments of shopping complex to fulfil the urban lifestyle. Based on the traffic impact assessment (TIA) practice, a shopping complex provides a parking space to meet the parking demand. However there is difficulty to obtain parking especially during noon at several major shopping complexes. Therefore, it entails some of the shopping center trip factor and indirectly affects the traffic system. The purpose of this paper is to determine the trip regeneration rate of the shopping center, in relation between the characteristic of shopping complex as independent variable with the estimated trip generation rate. In details, this study will determine the number of vehicle and pedestrian generated from the shopping complex for the purpose to compare between estimation trips with actual data. Level of service at the parking entering is determined by using link capacity analysis. Similar with the TIA practice, the approach to collect data are conventional by observation, taking picture and data recording. Besides that, a site inventory is conducted to determined number of shop and floor area. According to the analysis, during weekend produce more trip than weekday for both vehicle and pedestrian. Besides that, through the study the number of vehicle and pedestrian is higher during noon. It is obviously show, a shopping complex give differences trip rate based on the function and surrounding building of the study area. In the other hand, result of the observation showed, the estimation trip generation rate by regression equation are greatly differ by producing higher value than the actual data. Inaccuracy might be happened during the survey and an improvement is needed. In conclusion, this study successfully determined trip generation rate for a shopping complex. Further study should be conduct to improve this research. A model of regression equation should be proposed with variables model, in order to equally valid the estimation trip generation rate of shopping complex. Finally, by improving the provided transportation system it develop uncongested city and environment sustainability.
first_indexed 2024-03-06T11:55:57Z
format Undergraduates Project Papers
id UMPir10102
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T11:55:57Z
publishDate 2014
record_format dspace
spelling UMPir101022021-07-21T03:18:00Z http://umpir.ump.edu.my/id/eprint/10102/ Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex Nurulain, Roslan TE Highway engineering. Roads and pavements In recent years, there are rapid developments of shopping complex to fulfil the urban lifestyle. Based on the traffic impact assessment (TIA) practice, a shopping complex provides a parking space to meet the parking demand. However there is difficulty to obtain parking especially during noon at several major shopping complexes. Therefore, it entails some of the shopping center trip factor and indirectly affects the traffic system. The purpose of this paper is to determine the trip regeneration rate of the shopping center, in relation between the characteristic of shopping complex as independent variable with the estimated trip generation rate. In details, this study will determine the number of vehicle and pedestrian generated from the shopping complex for the purpose to compare between estimation trips with actual data. Level of service at the parking entering is determined by using link capacity analysis. Similar with the TIA practice, the approach to collect data are conventional by observation, taking picture and data recording. Besides that, a site inventory is conducted to determined number of shop and floor area. According to the analysis, during weekend produce more trip than weekday for both vehicle and pedestrian. Besides that, through the study the number of vehicle and pedestrian is higher during noon. It is obviously show, a shopping complex give differences trip rate based on the function and surrounding building of the study area. In the other hand, result of the observation showed, the estimation trip generation rate by regression equation are greatly differ by producing higher value than the actual data. Inaccuracy might be happened during the survey and an improvement is needed. In conclusion, this study successfully determined trip generation rate for a shopping complex. Further study should be conduct to improve this research. A model of regression equation should be proposed with variables model, in order to equally valid the estimation trip generation rate of shopping complex. Finally, by improving the provided transportation system it develop uncongested city and environment sustainability. 2014-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/10102/1/NURULAIN%20BINTI%20ROSLAN%20%23.PDF Nurulain, Roslan (2014) Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
spellingShingle TE Highway engineering. Roads and pavements
Nurulain, Roslan
Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title_full Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title_fullStr Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title_full_unstemmed Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title_short Regeneration of trips at Plaza Alam Sentral for the improvement of transportation system to/from shopping complex
title_sort regeneration of trips at plaza alam sentral for the improvement of transportation system to from shopping complex
topic TE Highway engineering. Roads and pavements
url http://umpir.ump.edu.my/id/eprint/10102/1/NURULAIN%20BINTI%20ROSLAN%20%23.PDF
work_keys_str_mv AT nurulainroslan regenerationoftripsatplazaalamsentralfortheimprovementoftransportationsystemtofromshoppingcomplex