Simulation Study of a Vehicle Production Line for Productivity Improvement
This paper presents the study of a motorcycle frame production line in a particular company in Malaysia. Due to the high demand, the company needs to increase its production by at least 12% compared with current output. In order to improve productivity, the production-floor data was collected and s...
Main Authors: | M. F. F., Ab Rashid, N. M. Zuki, N. M., A. N., Mohd Rose |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty Mechanical Engineering, UMP
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10173/1/3_Ab%20Rashid%20et%20al.pdf |
Similar Items
-
Productivity Improvement Through Line Balancing at Electronic Company - Case Study
by: A. F. H., Fansuri, et al.
Published: (2018) -
Production Layout Efficiency Improvement for Armoured Vehicle Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017) -
Modelling and optimization of energy efficient assembly line balancing using modified moth flame optimizer
by: M. F. F., Ab Rashid, et al.
Published: (2022) -
Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019) -
Improvement of productivity in low volume production industry layout by using witness simulation software
by: Jaffrey, V., et al.
Published: (2017)