Materials takeoff in building information modeling
Appropriate cost estimation, monitoring and controlling are the key point of construction project td succeed. 2D drawing has been a normal source of information and procedure since 1970's. The drawback of drawing based estimating however is its nature where it has limited information that is...
Autor principal: | |
---|---|
Formato: | Undergraduates Project Papers |
Idioma: | English |
Publicado em: |
2015
|
Assuntos: | |
Acesso em linha: | http://umpir.ump.edu.my/id/eprint/10852/1/MUHAMMAD%20SYAIFUL%20SAFWAN%20BIN%20NORDIN.PDF |