A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network

The growing of Photovoltaic (PV) power generation and integration into the electric power has started to touch on the stability and reliability of the network. As a result, standards have to be defined in guaranteeing a secure and reliable operation of the power system and one of the important topic...

Full description

Bibliographic Details
Main Authors: Al-Shetwi, Ali Q., Muhamad Zahim, Sujod, Noor Lina, Ramli
Format: Conference or Workshop Item
Language:English
English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/11525/1/A%20Review%20of%20the%20Fault%20Ride%20Through%20Requirements%20In%20Different%20Grid%20Codes%20Concerning%20Penetration%20of%20PV%20System%20to%20the%20Electric%20Power%20Network.pdf
http://umpir.ump.edu.my/id/eprint/11525/7/fkee-al-shetwi%2C%20ali%20q.-a%20review%20of%20the%20fault%20ride.pdf
_version_ 1825822656044204032
author Al-Shetwi, Ali Q.
Muhamad Zahim, Sujod
Noor Lina, Ramli
author_facet Al-Shetwi, Ali Q.
Muhamad Zahim, Sujod
Noor Lina, Ramli
author_sort Al-Shetwi, Ali Q.
collection UMP
description The growing of Photovoltaic (PV) power generation and integration into the electric power has started to touch on the stability and reliability of the network. As a result, standards have to be defined in guaranteeing a secure and reliable operation of the power system and one of the important topics is the capability of the PV system to ride through fault during the disturbance. This paper provides an overview and comparison study about Fault Ride-Through (FRT) capability requirements in the recent grid codes, which are enforced by transmission and distribution system operators in different Grid Codes (GCs) regarding the penetration of Photovoltaic Power Plant (PVPP) to medium and low voltage level of the network. This study compared the following common requirements such as FRT either Low Voltage Ride-Through (LVRT) or High Voltage Ride Through (HVRT), reactive current injection during and after the fault, restoring active power and frequency variations. In addition, by depending on this comparison and through studying the Malaysian grid standards, there is a similarity to USA standard thus this paper presents a proposal of FRT capability and frequency deviation for the Malaysian electric grid.
first_indexed 2024-03-06T11:59:51Z
format Conference or Workshop Item
id UMPir11525
institution Universiti Malaysia Pahang
language English
English
last_indexed 2024-03-06T11:59:51Z
publishDate 2015
record_format dspace
spelling UMPir115252019-10-18T02:41:18Z http://umpir.ump.edu.my/id/eprint/11525/ A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network Al-Shetwi, Ali Q. Muhamad Zahim, Sujod Noor Lina, Ramli TK Electrical engineering. Electronics Nuclear engineering The growing of Photovoltaic (PV) power generation and integration into the electric power has started to touch on the stability and reliability of the network. As a result, standards have to be defined in guaranteeing a secure and reliable operation of the power system and one of the important topics is the capability of the PV system to ride through fault during the disturbance. This paper provides an overview and comparison study about Fault Ride-Through (FRT) capability requirements in the recent grid codes, which are enforced by transmission and distribution system operators in different Grid Codes (GCs) regarding the penetration of Photovoltaic Power Plant (PVPP) to medium and low voltage level of the network. This study compared the following common requirements such as FRT either Low Voltage Ride-Through (LVRT) or High Voltage Ride Through (HVRT), reactive current injection during and after the fault, restoring active power and frequency variations. In addition, by depending on this comparison and through studying the Malaysian grid standards, there is a similarity to USA standard thus this paper presents a proposal of FRT capability and frequency deviation for the Malaysian electric grid. 2015 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/11525/1/A%20Review%20of%20the%20Fault%20Ride%20Through%20Requirements%20In%20Different%20Grid%20Codes%20Concerning%20Penetration%20of%20PV%20System%20to%20the%20Electric%20Power%20Network.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/11525/7/fkee-al-shetwi%2C%20ali%20q.-a%20review%20of%20the%20fault%20ride.pdf Al-Shetwi, Ali Q. and Muhamad Zahim, Sujod and Noor Lina, Ramli (2015) A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network. In: International Conference on Electrical Control and Computer Engineering 2015 , 27-28 October 2015 , Kuantan, Pahang. pp. 1-6.. (Unpublished) (Unpublished)
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Al-Shetwi, Ali Q.
Muhamad Zahim, Sujod
Noor Lina, Ramli
A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title_full A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title_fullStr A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title_full_unstemmed A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title_short A Review of the Fault Ride Through Requirements in Different Grid Codes Concerning Penetration of PV System to the Electric Power Network
title_sort review of the fault ride through requirements in different grid codes concerning penetration of pv system to the electric power network
topic TK Electrical engineering. Electronics Nuclear engineering
url http://umpir.ump.edu.my/id/eprint/11525/1/A%20Review%20of%20the%20Fault%20Ride%20Through%20Requirements%20In%20Different%20Grid%20Codes%20Concerning%20Penetration%20of%20PV%20System%20to%20the%20Electric%20Power%20Network.pdf
http://umpir.ump.edu.my/id/eprint/11525/7/fkee-al-shetwi%2C%20ali%20q.-a%20review%20of%20the%20fault%20ride.pdf
work_keys_str_mv AT alshetwialiq areviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork
AT muhamadzahimsujod areviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork
AT noorlinaramli areviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork
AT alshetwialiq reviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork
AT muhamadzahimsujod reviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork
AT noorlinaramli reviewofthefaultridethroughrequirementsindifferentgridcodesconcerningpenetrationofpvsystemtotheelectricpowernetwork