Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan

This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry...

Full description

Bibliographic Details
Main Author: Siti Zulaiha, Zainol
Format: Undergraduates Project Papers
Language:English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf
Description
Summary:This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient