Road Construction Equipment Management: A Case Study on Selected Industry

The major share of capital and equipment intensive operation goes to the road sector and the hydro – electric power projects. The construction sector in Ethiopia is developing at a fast rate and its capital budget is increasing from year to year. One of the reasons for this high growth is the numbe...

সম্পূর্ণ বিবরণ

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Atnaw, Samson M., Singh, Lakhveer, Hagos, F. Y., Yousuf, Abu
বিন্যাস: প্রবন্ধ
ভাষা:English
English
প্রকাশিত: Penerbit Universiti Malaysia Pahang 2016
বিষয়গুলি:
অনলাইন ব্যবহার করুন:http://umpir.ump.edu.my/id/eprint/13811/1/Road%20Construction%20Equipment%20Management-%20A%20Case%20Study%20on%20Selected.pdf
http://umpir.ump.edu.my/id/eprint/13811/7/ftech-2016-samson-Road%20Construction%20Equipment%20Management1.pdf