Composing of Lead Time Reduction Approach in Assembling an Electrical Product

The paper explores the lead time reduction projects that have been implemented in an electrical product assembly line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and action research hav...

Full description

Bibliographic Details
Main Authors: Intan Bazliah, Mohd, Abdullah, Ibrahim
Format: Article
Language:English
English
Published: Penerbit Universiti Malaysia Pahang 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/13927/1/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction%20Approach.pdf
http://umpir.ump.edu.my/id/eprint/13927/7/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction.pdf

Similar Items