Composing of Lead Time Reduction Approach in Assembling an Electrical Product
The paper explores the lead time reduction projects that have been implemented in an electrical product assembly line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and action research hav...
Main Authors: | Intan Bazliah, Mohd, Abdullah, Ibrahim |
---|---|
Format: | Article |
Language: | English English |
Published: |
Penerbit Universiti Malaysia Pahang
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/13927/1/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction%20Approach.pdf http://umpir.ump.edu.my/id/eprint/13927/7/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction.pdf |
Similar Items
-
Potential electricity bill reduction in university building through load shifting strategy
by: Abdullah, Md. Fauzi, et al.
Published: (2012) -
Impact of different time of use electricity pricing structure on residential consumer
by: Mohd. Azman, Nur Azrina, et al.
Published: (2018) -
Real-time implementation of twelve-lead automated electrocardiogram system measurement for QT dispersion analysis
by: Jamaludin, Mohd. Najeb
Published: (2007) -
Mechanical Assemblies Design Of Underwater Electric Motor.
by: Che Maideen, Normariah, et al.
Published: (2008) -
Residential electricity time of use (ToU) pricing for Malaysia
by: Abdullah, Md. Pauzi, et al.
Published: (2014)