Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints

Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB probl...

Full description

Bibliographic Details
Main Authors: Muhammad Razif, Abdullah Make, M. F. F., Ab Rashid, Muhamad Magffierah, Razali
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf
_version_ 1796991793142693888
author Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
author_facet Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
author_sort Muhammad Razif, Abdullah Make
collection UMP
description Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem.
first_indexed 2024-03-06T12:10:38Z
format Conference or Workshop Item
id UMPir15756
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:10:38Z
publishDate 2016
publisher IOP Publishing
record_format dspace
spelling UMPir157562016-12-20T02:27:25Z http://umpir.ump.edu.my/id/eprint/15756/ Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali TS Manufactures Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem. IOP Publishing 2016-12 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf Muhammad Razif, Abdullah Make and M. F. F., Ab Rashid and Muhamad Magffierah, Razali (2016) Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints. In: IOP Conference Series: Materials Science and Engineering, International Engineering Research and Innovation Symposium (IRIS) , 24-25 November 2016 , Melaka, Malaysia. pp. 1-9., 160 (012005). ISSN 1757-8981 (Print), 1757-899X (Online) http://dx.doi.org/10.1088/1757-899X/160/1/012005 012005
spellingShingle TS Manufactures
Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title_full Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title_fullStr Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title_full_unstemmed Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title_short Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
title_sort modelling of two sided assembly line balancing problem with resource constraints
topic TS Manufactures
url http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf
work_keys_str_mv AT muhammadrazifabdullahmake modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints
AT mffabrashid modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints
AT muhamadmagffierahrazali modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints