Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB probl...
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf |
_version_ | 1825823395184377856 |
---|---|
author | Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali |
author_facet | Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali |
author_sort | Muhammad Razif, Abdullah Make |
collection | UMP |
description | Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem. |
first_indexed | 2024-03-06T12:10:38Z |
format | Conference or Workshop Item |
id | UMPir15756 |
institution | Universiti Malaysia Pahang |
language | English |
last_indexed | 2024-03-06T12:10:38Z |
publishDate | 2016 |
publisher | IOP Publishing |
record_format | dspace |
spelling | UMPir157562016-12-20T02:27:25Z http://umpir.ump.edu.my/id/eprint/15756/ Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali TS Manufactures Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem. IOP Publishing 2016-12 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf Muhammad Razif, Abdullah Make and M. F. F., Ab Rashid and Muhamad Magffierah, Razali (2016) Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints. In: IOP Conference Series: Materials Science and Engineering, International Engineering Research and Innovation Symposium (IRIS) , 24-25 November 2016 , Melaka, Malaysia. pp. 1-9., 160 (012005). ISSN 1757-8981 (Print), 1757-899X (Online) (Published) http://dx.doi.org/10.1088/1757-899X/160/1/012005 012005 |
spellingShingle | TS Manufactures Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title | Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title_full | Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title_fullStr | Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title_full_unstemmed | Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title_short | Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints |
title_sort | modelling of two sided assembly line balancing problem with resource constraints |
topic | TS Manufactures |
url | http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf |
work_keys_str_mv | AT muhammadrazifabdullahmake modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints AT mffabrashid modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints AT muhamadmagffierahrazali modellingoftwosidedassemblylinebalancingproblemwithresourceconstraints |