A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining

This thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better...

Full description

Bibliographic Details
Main Author: Wan Nurul Athia, Wan Mohd Zamani
Format: Undergraduates Project Papers
Language:English
Published: 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/16209/1/45.A%20study%20%26%20implementation%20of%20kaizen%20strategy%20for%20line%20production%20%28cap%20cam%20shaft%29%20in%20Sapura%20Machining.pdf
_version_ 1796991876502388736
author Wan Nurul Athia, Wan Mohd Zamani
author_facet Wan Nurul Athia, Wan Mohd Zamani
author_sort Wan Nurul Athia, Wan Mohd Zamani
collection UMP
description This thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better work sequence. The project method conducted is by doing the Gemba Walk and observed the OFI (Opportunity for Improvement). 5S had been implement based on the problem observe from the line production. The aim is to increase the cleanliness, safety for operator by using PPE (Personal Protective Equipment) and the training to discipline the operator. For standardized work, cycle time need to be record for before and after. The non-value added is reduce in the time taken to increase the line efficiency. Standardized work is made using simulation of Tecnomatix Software which is the plant need to be arrange like actual layout and insert the cycle time for each machine. For the result, 5S method that had been implement has been awarded as a ‘Best Line 3S Finding Activity’ and ‘5S best Practice’. For standardized work the line efficiency increase from 70.23% to 95.43% and the transportation material time success to be reduce from 49.71% to 4.57%.
first_indexed 2024-03-06T12:11:49Z
format Undergraduates Project Papers
id UMPir16209
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:11:49Z
publishDate 2016
record_format dspace
spelling UMPir162092023-02-23T08:01:06Z http://umpir.ump.edu.my/id/eprint/16209/ A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining Wan Nurul Athia, Wan Mohd Zamani T Technology (General) TS Manufactures This thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better work sequence. The project method conducted is by doing the Gemba Walk and observed the OFI (Opportunity for Improvement). 5S had been implement based on the problem observe from the line production. The aim is to increase the cleanliness, safety for operator by using PPE (Personal Protective Equipment) and the training to discipline the operator. For standardized work, cycle time need to be record for before and after. The non-value added is reduce in the time taken to increase the line efficiency. Standardized work is made using simulation of Tecnomatix Software which is the plant need to be arrange like actual layout and insert the cycle time for each machine. For the result, 5S method that had been implement has been awarded as a ‘Best Line 3S Finding Activity’ and ‘5S best Practice’. For standardized work the line efficiency increase from 70.23% to 95.43% and the transportation material time success to be reduce from 49.71% to 4.57%. 2016-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/16209/1/45.A%20study%20%26%20implementation%20of%20kaizen%20strategy%20for%20line%20production%20%28cap%20cam%20shaft%29%20in%20Sapura%20Machining.pdf Wan Nurul Athia, Wan Mohd Zamani (2016) A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
spellingShingle T Technology (General)
TS Manufactures
Wan Nurul Athia, Wan Mohd Zamani
A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title_full A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title_fullStr A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title_full_unstemmed A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title_short A study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
title_sort study implementation of kaizen strategy for line production cap cam shaft in sapura machining
topic T Technology (General)
TS Manufactures
url http://umpir.ump.edu.my/id/eprint/16209/1/45.A%20study%20%26%20implementation%20of%20kaizen%20strategy%20for%20line%20production%20%28cap%20cam%20shaft%29%20in%20Sapura%20Machining.pdf
work_keys_str_mv AT wannurulathiawanmohdzamani astudyimplementationofkaizenstrategyforlineproductioncapcamshaftinsapuramachining
AT wannurulathiawanmohdzamani studyimplementationofkaizenstrategyforlineproductioncapcamshaftinsapuramachining