Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam

This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower sy...

Full description

Bibliographic Details
Main Authors: Hammid, Ali Thaeer, M. H., Sulaiman
Format: Conference or Workshop Item
Language:English
Published: EDP Sciences 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19531/1/fkee-2017-ali-Optimal%20Long-Term%20Hydro%20Generation%20Scheduling%20of%20Small%20Hydropower.pdf
_version_ 1796992424737767424
author Hammid, Ali Thaeer
M. H., Sulaiman
author_facet Hammid, Ali Thaeer
M. H., Sulaiman
author_sort Hammid, Ali Thaeer
collection UMP
description This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower system, which is done by optimizing the variables of operation control in the hydropower plant at Lake Himreen - Diyala Dam. The variables mentioned are net turbine head, the rate of water flow and power production which had been gathered in the data during a research throughout a 10-year period. The results obtained from these two methods, namely Firefly Algorithm (FA) and Particle Swarm Optimization, (PSO) are compared. The inferences for general comparisons are created through several behavior indicators. The behavior indicators illustrate that FA's performance is better than PSO's performance, in some fields. At the end, the results show the strength of FA, as well as its efficiency and superiority.
first_indexed 2024-03-06T12:19:53Z
format Conference or Workshop Item
id UMPir19531
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:19:53Z
publishDate 2017
publisher EDP Sciences
record_format dspace
spelling UMPir195312018-05-21T05:11:32Z http://umpir.ump.edu.my/id/eprint/19531/ Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam Hammid, Ali Thaeer M. H., Sulaiman TK Electrical engineering. Electronics Nuclear engineering This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower system, which is done by optimizing the variables of operation control in the hydropower plant at Lake Himreen - Diyala Dam. The variables mentioned are net turbine head, the rate of water flow and power production which had been gathered in the data during a research throughout a 10-year period. The results obtained from these two methods, namely Firefly Algorithm (FA) and Particle Swarm Optimization, (PSO) are compared. The inferences for general comparisons are created through several behavior indicators. The behavior indicators illustrate that FA's performance is better than PSO's performance, in some fields. At the end, the results show the strength of FA, as well as its efficiency and superiority. EDP Sciences 2017 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/19531/1/fkee-2017-ali-Optimal%20Long-Term%20Hydro%20Generation%20Scheduling%20of%20Small%20Hydropower.pdf Hammid, Ali Thaeer and M. H., Sulaiman (2017) Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam. In: MATEC Web of Conferences: UTP-UMP Symposium on Energy Systems 2017 (SES 2017) , 26-27 September 2017 , Perak, Malaysia. pp. 1-5., 131 (04017). ISSN 2261-236X https://doi.org/10.1051/matecconf/201713104017
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Hammid, Ali Thaeer
M. H., Sulaiman
Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title_full Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title_fullStr Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title_full_unstemmed Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title_short Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
title_sort optimal long term hydro generation scheduling of small hydropower plant shp using metaheuristic algorithm in himreen lake dam
topic TK Electrical engineering. Electronics Nuclear engineering
url http://umpir.ump.edu.my/id/eprint/19531/1/fkee-2017-ali-Optimal%20Long-Term%20Hydro%20Generation%20Scheduling%20of%20Small%20Hydropower.pdf
work_keys_str_mv AT hammidalithaeer optimallongtermhydrogenerationschedulingofsmallhydropowerplantshpusingmetaheuristicalgorithminhimreenlakedam
AT mhsulaiman optimallongtermhydrogenerationschedulingofsmallhydropowerplantshpusingmetaheuristicalgorithminhimreenlakedam