Problem and dilemma faced by Malaysia contractor when handling international project
The exploration of Malaysian contractors into the international construction market is now more than 20 years old which is from 1970.This is due to increase of Malaysia contractors in domestic market which caused number of contract imbalanced. Although Malaysia contractor gaining success in internat...
Main Author: | Marhazlin, Mohamad |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/21448/1/Problem%20and%20dilemma%20faced%20by%20Malaysia%20contractor%20when%20handling%20international%20project.pdf |
Similar Items
-
A study on the problems facing by G1 and G2 contractors in Malaysia
by: Afiqah Farhana, Zamani
Published: (2017) -
The performance of Felda Plantations Sdn. Bhd. contractors
by: Ibrahim, Ramzi
Published: (2006) -
The study of dependency factors on foreign worker in construction industry : contractor perspective
by: Nur Hidayah, Aliman
Published: (2017) -
Technical competencies of oil and gas construction project managers in Malaysia
by: Razi, P. Z., et al.
Published: (2021) -
A case study of abandoned housing projects in Selangor
by: Muhammad Faizal, Abdul Rahman
Published: (2018)