Life Cycle Cost Analysis Of Different Repair Assumptions

This paper presents a mathematical model to estimate the life cycle cost (LCC) of 10 repairable equipment by taking pump as a case. Acquisition, Operation and Maintenance cost are calculated using activity based costing. Number of failure for maintenance cost is calculated for three repair assumptio...

Full description

Bibliographic Details
Main Authors: Mulubrhan, Freselam, Azian, Ibrahim, Ainul Akmar, Mokhtar, Masdi, Muhammad
Format: Conference or Workshop Item
Language:English
Published: 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/24032/1/Life%20Cycle%20Cost%20Analysis%20Of%20Different%20Repair%20Assumptions.pdf
_version_ 1796993202011504640
author Mulubrhan, Freselam
Azian, Ibrahim
Ainul Akmar, Mokhtar
Masdi, Muhammad
author_facet Mulubrhan, Freselam
Azian, Ibrahim
Ainul Akmar, Mokhtar
Masdi, Muhammad
author_sort Mulubrhan, Freselam
collection UMP
description This paper presents a mathematical model to estimate the life cycle cost (LCC) of 10 repairable equipment by taking pump as a case. Acquisition, Operation and Maintenance cost are calculated using activity based costing. Number of failure for maintenance cost is calculated for three repair assumptions based on the effectiveness of the maintenance. According to the characteristic that the cumulative failure probability observed a Weibull distribution model is used. General renewal process (GRP) is used to determine these three states. The results of the study show that, acquisition cost is less than 3%, operation cost is in between 85 to 91% and maintenance cost being between 6 to 13% which increase almost two times for minimal repair. Operation and maintenance cost are the highest of the total LCC therefore, it is necessary to have a long-term outlook to the investment decision-making process rather than trying to save money in the short-term by simply purchasing assets with lower initial acquisition costs.
first_indexed 2024-03-06T12:30:41Z
format Conference or Workshop Item
id UMPir24032
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:30:41Z
publishDate 2018
record_format dspace
spelling UMPir240322019-01-29T03:15:32Z http://umpir.ump.edu.my/id/eprint/24032/ Life Cycle Cost Analysis Of Different Repair Assumptions Mulubrhan, Freselam Azian, Ibrahim Ainul Akmar, Mokhtar Masdi, Muhammad HD Industries. Land use. Labor This paper presents a mathematical model to estimate the life cycle cost (LCC) of 10 repairable equipment by taking pump as a case. Acquisition, Operation and Maintenance cost are calculated using activity based costing. Number of failure for maintenance cost is calculated for three repair assumptions based on the effectiveness of the maintenance. According to the characteristic that the cumulative failure probability observed a Weibull distribution model is used. General renewal process (GRP) is used to determine these three states. The results of the study show that, acquisition cost is less than 3%, operation cost is in between 85 to 91% and maintenance cost being between 6 to 13% which increase almost two times for minimal repair. Operation and maintenance cost are the highest of the total LCC therefore, it is necessary to have a long-term outlook to the investment decision-making process rather than trying to save money in the short-term by simply purchasing assets with lower initial acquisition costs. 2018 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/24032/1/Life%20Cycle%20Cost%20Analysis%20Of%20Different%20Repair%20Assumptions.pdf Mulubrhan, Freselam and Azian, Ibrahim and Ainul Akmar, Mokhtar and Masdi, Muhammad (2018) Life Cycle Cost Analysis Of Different Repair Assumptions. In: 4th ASIA International Conference (AIC 2018) , 8-9 December 2018 , Langkawi International Convention Center (LICC). p. 2.. http://www.utm.my/asia/
spellingShingle HD Industries. Land use. Labor
Mulubrhan, Freselam
Azian, Ibrahim
Ainul Akmar, Mokhtar
Masdi, Muhammad
Life Cycle Cost Analysis Of Different Repair Assumptions
title Life Cycle Cost Analysis Of Different Repair Assumptions
title_full Life Cycle Cost Analysis Of Different Repair Assumptions
title_fullStr Life Cycle Cost Analysis Of Different Repair Assumptions
title_full_unstemmed Life Cycle Cost Analysis Of Different Repair Assumptions
title_short Life Cycle Cost Analysis Of Different Repair Assumptions
title_sort life cycle cost analysis of different repair assumptions
topic HD Industries. Land use. Labor
url http://umpir.ump.edu.my/id/eprint/24032/1/Life%20Cycle%20Cost%20Analysis%20Of%20Different%20Repair%20Assumptions.pdf
work_keys_str_mv AT mulubrhanfreselam lifecyclecostanalysisofdifferentrepairassumptions
AT azianibrahim lifecyclecostanalysisofdifferentrepairassumptions
AT ainulakmarmokhtar lifecyclecostanalysisofdifferentrepairassumptions
AT masdimuhammad lifecyclecostanalysisofdifferentrepairassumptions