Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study

Construction sector is a very important and productive sector in the Malaysian economy. A project is considered successful if it can be completed at an estimated cost, within a scheduled period and in accordance with specified quality specifications. However, there are also contractors failing to co...

Full description

Bibliographic Details
Main Author: Nur Syazana, Jusoh
Format: Undergraduates Project Papers
Language:English
Published: 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26263/1/26.Assesment%20of%20construction%20planning%20-%20maintenance%20of%20piping%20system%20at%20Bukit%20Sekilau%20Kuantan%20case%20study.pdf
_version_ 1825812946660360192
author Nur Syazana, Jusoh
author_facet Nur Syazana, Jusoh
author_sort Nur Syazana, Jusoh
collection UMP
description Construction sector is a very important and productive sector in the Malaysian economy. A project is considered successful if it can be completed at an estimated cost, within a scheduled period and in accordance with specified quality specifications. However, there are also contractors failing to complete the project within a scheduled period. There is a possibility that this situation can be caused by the time set is less precise. The main objective of this study is construction planning to maintain the piping system in Bukit Sekilau, Kuantan. Existing schedule planning has been analyzed to identify factors that cause delays in the project. After identifying the factors affecting the delay of the project, reschedules planning were made taking into account the number of days of rain, the number of public holidays and the number of days required to obtain approval from the parties concerned. Therefore, optimum planning can be achieved and the project can be completed on time, cost, quality and operations can be implemented in line with the plan. After obtaining optimum working days in construction planning, certain recommendations can be made in order to improve construction planning and can be the guideline for future construction planning.
first_indexed 2024-03-06T12:36:40Z
format Undergraduates Project Papers
id UMPir26263
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:36:40Z
publishDate 2018
record_format dspace
spelling UMPir262632023-04-14T01:02:47Z http://umpir.ump.edu.my/id/eprint/26263/ Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study Nur Syazana, Jusoh TA Engineering (General). Civil engineering (General) TH Building construction Construction sector is a very important and productive sector in the Malaysian economy. A project is considered successful if it can be completed at an estimated cost, within a scheduled period and in accordance with specified quality specifications. However, there are also contractors failing to complete the project within a scheduled period. There is a possibility that this situation can be caused by the time set is less precise. The main objective of this study is construction planning to maintain the piping system in Bukit Sekilau, Kuantan. Existing schedule planning has been analyzed to identify factors that cause delays in the project. After identifying the factors affecting the delay of the project, reschedules planning were made taking into account the number of days of rain, the number of public holidays and the number of days required to obtain approval from the parties concerned. Therefore, optimum planning can be achieved and the project can be completed on time, cost, quality and operations can be implemented in line with the plan. After obtaining optimum working days in construction planning, certain recommendations can be made in order to improve construction planning and can be the guideline for future construction planning. 2018-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26263/1/26.Assesment%20of%20construction%20planning%20-%20maintenance%20of%20piping%20system%20at%20Bukit%20Sekilau%20Kuantan%20case%20study.pdf Nur Syazana, Jusoh (2018) Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=7731
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Nur Syazana, Jusoh
Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title_full Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title_fullStr Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title_full_unstemmed Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title_short Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
title_sort assesment of construction planning maintenance of piping system at bukit sekilau kuantan case study
topic TA Engineering (General). Civil engineering (General)
TH Building construction
url http://umpir.ump.edu.my/id/eprint/26263/1/26.Assesment%20of%20construction%20planning%20-%20maintenance%20of%20piping%20system%20at%20Bukit%20Sekilau%20Kuantan%20case%20study.pdf
work_keys_str_mv AT nursyazanajusoh assesmentofconstructionplanningmaintenanceofpipingsystematbukitsekilaukuantancasestudy