Productivity study and line balancing of GGMG & CALICO production line
Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, pro...
Main Authors: | Hartini, Mustafa, A. R., Yusoff, M. Yusoff, Ismail |
---|---|
Format: | Article |
Language: | English |
Published: |
Trans Tech Publications, Switzerland
2012
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf |
Similar Items
-
Productivity improvement through line balancing
by: Hazmil, Hapaz
Published: (2008) -
An integrated model for production line balancing planning
by: Ali, A. J. Adham
Published: (2012) -
Line Balancing Analysis of a Multi-Products Processing with a Single Type of Supply
by: Mohd Syahidan, Kamarudin, et al.
Published: (2015) -
Improving productivity through line balancing : a case study
by: Lim, Chuan Pei, et al.
Published: (2002) -
Productivity improvement through line balancing technique in a small medium enterprise (SME) manufacturing plant
by: Shahfiran, Sarifuddin
Published: (2007)