Using mediation in project disputes based on theory of planned behavior and technology acceptance model
The construction industry has been afflicted by various contractual issues. Alternative dispute resolution (ADR) methods such as arbitration, mediation, expert review, and adjudication techniques have been used to resolve construction disputes effectively. However, among these types of ADR methods,...
Main Authors: | Lee, Chia Kuang, Lee, Mei Sin, Thurasamy, Ramayah |
---|---|
Format: | Article |
Language: | English |
Published: |
American Society of Civil Engineers (ASCE)
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/27243/1/Using%20mediation%20in%20project%20disputes%20based%20on%20theory%20.pdf |
Similar Items
-
Predicting intention to use alternative dispute resolution (ADR): an empirical test of theory of planned behaviour (TPB) model
by: Lee, Chia Kuang, et al.
Published: (2018) -
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010) -
Formulation of safety predictors in construction sites through the lens of theory of planned behaviour: A dematel based model
by: Kang, Chun Xiang, et al.
Published: (2024) -
Predicting safety compliance and behaviour: An extended theory of planned behaviour
by: Lim, Chun Aik, et al.
Published: (2024) -
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)