Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing

Malaysia is currently the world’s largest exporter of palm oil although it is the second-largest producer of the oil after neighboring Indonesia. There have recently been few concerns on this plantation. There are difficulties to understand the variance in the operations, the rate setting is inadequ...

Full description

Bibliographic Details
Main Authors: S. N. A. M., Zaini, Abu, Mohd Yazid
Format: Article
Language:English
Published: Penerbit UMP 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29428/7/Assessment%20the%20capacity%20utilization%20of%20mature%20and%20immature%20area%20of%20replanting.pdf
_version_ 1825813516193366016
author S. N. A. M., Zaini
Abu, Mohd Yazid
author_facet S. N. A. M., Zaini
Abu, Mohd Yazid
author_sort S. N. A. M., Zaini
collection UMP
description Malaysia is currently the world’s largest exporter of palm oil although it is the second-largest producer of the oil after neighboring Indonesia. There have recently been few concerns on this plantation. There are difficulties to understand the variance in the operations, the rate setting is inadequate to outlined the relation between the resources supplied and the capacity in operation, and finally the manager has no system to track the used and unused capacity. The aim of this work is to assess the capacity utilization of mature and immature area at replanting for a better accuracy. Time-driven activity-based costs (TDABC) is used because time efficiency can be calculated effectively. Furthermore, it also can precisely evaluate idle capacity and separately listing the resources being used and not used. This work considers a data in 2017 to develop the solution. This work found that in the mature area from the available capacity utilization, chipping has high insufficient capacity with RM-1931518.08, planting seedlings has high insufficient capacity with 805173.84 minutes and internal transport has high waste cost with RM45771.30. Meanwhile, in the immature area, planting seedlings has high insufficient capacity with 566934.84 minutes and RM-1621433.64, manuring has unused capacity with 66763.50 minutes and internal transport has high waste cost with RM29667.47.
first_indexed 2024-03-06T12:45:10Z
format Article
id UMPir29428
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T12:45:10Z
publishDate 2020
publisher Penerbit UMP
record_format dspace
spelling UMPir294282020-12-09T02:11:38Z http://umpir.ump.edu.my/id/eprint/29428/ Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing S. N. A. M., Zaini Abu, Mohd Yazid S Agriculture (General) T Technology (General) Malaysia is currently the world’s largest exporter of palm oil although it is the second-largest producer of the oil after neighboring Indonesia. There have recently been few concerns on this plantation. There are difficulties to understand the variance in the operations, the rate setting is inadequate to outlined the relation between the resources supplied and the capacity in operation, and finally the manager has no system to track the used and unused capacity. The aim of this work is to assess the capacity utilization of mature and immature area at replanting for a better accuracy. Time-driven activity-based costs (TDABC) is used because time efficiency can be calculated effectively. Furthermore, it also can precisely evaluate idle capacity and separately listing the resources being used and not used. This work considers a data in 2017 to develop the solution. This work found that in the mature area from the available capacity utilization, chipping has high insufficient capacity with RM-1931518.08, planting seedlings has high insufficient capacity with 805173.84 minutes and internal transport has high waste cost with RM45771.30. Meanwhile, in the immature area, planting seedlings has high insufficient capacity with 566934.84 minutes and RM-1621433.64, manuring has unused capacity with 66763.50 minutes and internal transport has high waste cost with RM29667.47. Penerbit UMP 2020-09-30 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/29428/7/Assessment%20the%20capacity%20utilization%20of%20mature%20and%20immature%20area%20of%20replanting.pdf S. N. A. M., Zaini and Abu, Mohd Yazid (2020) Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing. Journal of Modern Manufacturing Systems and Technology (JMMST), 4 (2). pp. 7-11. ISSN 2636-9575. (Published) https://doi.org/10.15282/jmmst.v4i2.4883 https://doi.org/10.15282/jmmst.v4i2.4883
spellingShingle S Agriculture (General)
T Technology (General)
S. N. A. M., Zaini
Abu, Mohd Yazid
Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title_full Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title_fullStr Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title_full_unstemmed Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title_short Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
title_sort assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
topic S Agriculture (General)
T Technology (General)
url http://umpir.ump.edu.my/id/eprint/29428/7/Assessment%20the%20capacity%20utilization%20of%20mature%20and%20immature%20area%20of%20replanting.pdf
work_keys_str_mv AT snamzaini assessmentthecapacityutilizationofmatureandimmatureareaofreplantingusingtimedrivenactivitybasedcosting
AT abumohdyazid assessmentthecapacityutilizationofmatureandimmatureareaofreplantingusingtimedrivenactivitybasedcosting