Investigating the relationship between site supervision and IBS based construction projects

Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting sit...

Full description

Bibliographic Details
Main Authors: Syamsyul Hairi, M. S., Wan Salleh, W. R., A. R., Rahimi, Doh, Shu Ing
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29938/1/2020%20Investigating%20the%20Relationship%20between%20Site%20Supervision%20and%20IBS%20Based%20Construction%20Projects.pdf
Description
Summary:Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting site supervision and most construction works are not delivered on time and consequently have a problem during installation of IBS. Therefore, the main aim of the study is to identify the factors affecting site supervision in improving IBS productivity. The study adopts a questionnaire survey approach to elicit information from the respondents, and out of the seventy questionnaires administered fifty-five were retrieved. The information and the data from the questionnaires were analyzed using the average index method. From the finding analysis, the main factors affecting site supervision is on-site construction process. While the main problem during installation of IBS is required planning on time delivery. It is recommended that the quality of IBS product or components should be enhanced to promote better site supervision