Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
Two-sided Assembly Line Balancing (2S-ALB) is important in assembly plants that produce large-sized high-volume products, such as in automotive production. The 2S-ALB problem involves different assembly resources such as worker skills, tools, and machines required for the assembly. This research mod...
Main Authors: | Muhammad Razif, Abdullah Make, M. F. F., Ab Rashid |
---|---|
Format: | Article |
Language: | English |
Published: |
Sharif University of Technology, Tehran, I.R. Iran
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/30107/2/SCI220421603139400.pdf |
Similar Items
-
Optimization of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2022) -
Optimization of two sided assembly line balancing with resource constraint
by: Muhammad Razif, Abdullah Make
Published: (2022) -
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016) -
Intergrated multi-objective optimisation of assembly sequence planning and assembly line balancing using particle swarm optimisation
by: M. F. F., Ab Rashid
Published: (2013) -
Modelling and optimisation of assembly line balancing problem with resource constraint
by: Nur Hairunnisa, Kamarudin
Published: (2019)