Study on factors that lead to the abandoned building project in Borneo (Sabah & Sarawak)
Housing projects are classified as "abandoned" by the Ministry of Housing and Local Government (MHLG) when there is no activity at the project site, continuously, for more than six months after the expected date of delivery of vacant possession. This is based on the date of the first Sale...
Main Author: | Izyana Jannati, Sabri |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/30509/1/Study%20on%20factors%20that%20lead%20to%20the%20abandoned%20building%20project%20in%20Borneo.pdf |
Similar Items
Similar Items
-
Study on economics of abandoned building in peninsular Malaysia
by: Muhamad Samrie, Sakkaran
Published: (2019) -
Assessment on abandoned housing project: Impact and revitalization in Malaysia
by: Saidah An'nisaa, Salam, et al.
Published: (2023) -
The effect on unfavourable economic conditions in Malaysia to abandoned housing project
by: Nur Farhayu, Ariffin, et al. -
The probabilistic of abandoned project status using ordinal logistic regression analysis
by: Salam, Saidah An’nisaa, et al.
Published: (2023) -
Modeling the construction readiness parameters for abandoned housing projects in Malaysia: PLS-SEM approach
by: N. Aishah, Abdul-Rahman, et al.
Published: (2024)