A case study on the determination of unused capacity using time driven activity-based costing for electronic component
Nowadays, demand for magnetic components are increasing from customer to support technological needs. It is important for the producer to incorporate an accurate cost estimation to decide the best price to gain better profits. However, actual costing structure is ignored the potential of time equati...
Main Authors: | N. F., Zamrud, S.N.A.M., Zaini, M. Y., Abu |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/32392/7/A%20case%20study%20on%20the%20determination%20of%20unused.pdf |
Similar Items
-
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020) -
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023) -
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021) -
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020) -
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)