The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution

This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constrain...

Full description

Bibliographic Details
Main Authors: M. N. M., Kahar, G., Kendall
Format: Article
Language:English
English
Published: Science Direct 2021
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf
http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf
_version_ 1796994992068100096
author M. N. M., Kahar
G., Kendall
author_facet M. N. M., Kahar
G., Kendall
author_sort M. N. M., Kahar
collection UMP
description This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constraints provide additional challenges in defining a suitable model and in developing a constructive heuristic. One of the contributions of this paper is to formally define this real-world problem. A further contribution is the constructive heuristic that is able to produce good quality solutions for the problem, which are superior to the solutions that are produced using the university’s current software. Moreover, our method adheres to all hard constraints which the current systems fails to do.
first_indexed 2024-03-06T12:55:45Z
format Article
id UMPir33571
institution Universiti Malaysia Pahang
language English
English
last_indexed 2024-03-06T12:55:45Z
publishDate 2021
publisher Science Direct
record_format dspace
spelling UMPir335712022-04-11T07:06:43Z http://umpir.ump.edu.my/id/eprint/33571/ The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution M. N. M., Kahar G., Kendall QA76 Computer software This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constraints provide additional challenges in defining a suitable model and in developing a constructive heuristic. One of the contributions of this paper is to formally define this real-world problem. A further contribution is the constructive heuristic that is able to produce good quality solutions for the problem, which are superior to the solutions that are produced using the university’s current software. Moreover, our method adheres to all hard constraints which the current systems fails to do. Science Direct 2021 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf pdf en http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf M. N. M., Kahar and G., Kendall (2021) The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution. European Journal of Operational Research, 207 (2). pp. 1-9. ISSN 0377 - 2217. (Published) https://doi.org/10.1016/j.ejor.2010.04.011 https://doi.org/10.1016/j.ejor.2010.04.011
spellingShingle QA76 Computer software
M. N. M., Kahar
G., Kendall
The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title_full The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title_fullStr The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title_full_unstemmed The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title_short The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
title_sort examination timetabling problem at universiti malaysia pahang comparison of a constructive heuristic with an existing software solution
topic QA76 Computer software
url http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf
http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf
work_keys_str_mv AT mnmkahar theexaminationtimetablingproblematuniversitimalaysiapahangcomparisonofaconstructiveheuristicwithanexistingsoftwaresolution
AT gkendall theexaminationtimetablingproblematuniversitimalaysiapahangcomparisonofaconstructiveheuristicwithanexistingsoftwaresolution
AT mnmkahar examinationtimetablingproblematuniversitimalaysiapahangcomparisonofaconstructiveheuristicwithanexistingsoftwaresolution
AT gkendall examinationtimetablingproblematuniversitimalaysiapahangcomparisonofaconstructiveheuristicwithanexistingsoftwaresolution