Guided genetic algorithm for solving unrelated parallel machine scheduling problem with additional resources
This paper solved the unrelated parallel machine scheduling with additional resources (UPMR) problem. The processing time and the number of required resources for each job rely on the machine that does the processing. Each job j needed units of resources (rjm) during its time of processing on a mach...
Main Authors: | Abed, Munther Hameed, Mohd Nizam Mohmad, Kahar |
---|---|
Format: | Article |
Language: | English |
Published: |
Institute of Advanced Engineering and Science
2022
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/34633/1/Guided%20genetic%20algorithm%20for%20solving%20unrelated%20parallel%20machine%20scheduling.pdf |
Similar Items
-
Hybridizing guided genetic algorithm and single-based metaheuristics to solve unrelated parallel machine scheduling problem with scarce resources
by: Abed, Munther H., et al.
Published: (2023) -
Review on unrelated parallel machine scheduling problem with additional resources
by: Abed, Munther H., et al.
Published: (2023) -
Window-based multi-objective optimization for dynamic patient scheduling with problem-specific operators
by: Mahmed, Ali Nader, et al.
Published: (2022) -
Simulation for dynamic patients scheduling based on many objective optimization and coordinator
by: Mahmed, Ali Nader, et al.
Published: (2024) -
Efficiency of post-processing in PMU based state estimation of renewable energy microgrids
by: Abed, Amir Hameed, et al.
Published: (2023)