Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
In current practice of costing method in palm oil plantation, the method does not implement time equation so processing time determined by company is not in accordance with actual processing time in work station. Then, the present implementation in academic library do not illustrate the correlation...
Main Authors: | Sri Nur Areena, Mohd Zaini, Mohd Yazid, Abu |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Utara Malaysia
2022
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/34846/7/Development%20A%20New%20Costing%20Structure.pdf |
Similar Items
-
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021) -
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021) -
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021) -
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019) -
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)