Risk assessment of public road construction projects using analytical hierarchy process (AHP)

Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of r...

Full description

Bibliographic Details
Main Author: Putri Aifa Syuhaida, Shabuddin
Format: Undergraduates Project Papers
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/35876/1/Risk%20assessment%20of%20public%20road%20construction%20projects%20using%20analytical%20hierarchy%20process%20%28AHP%29.pdf
_version_ 1825814675616432128
author Putri Aifa Syuhaida, Shabuddin
author_facet Putri Aifa Syuhaida, Shabuddin
author_sort Putri Aifa Syuhaida, Shabuddin
collection UMP
description Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of risk to occur which places the road construction project at risk of cost, time overruns and poor quality delivery. The aim of this study was to analyze the risk assessment of public road construction projects. The factors and sub-factors of risk in public road construction project were scrutinized from the literature review. The designate pair-wise questionnaire survey was distributed to the road engineering section of public work department, road contractors and road concessionaires in accordance with the Analytic Hierarchy Process (AHP). This study identified the most prioritized risk factors as follows: economic and financial (0.267), technical (0.165), organizational (0.148), contractual (0.130), natural hazard (0.125), socio and politic (0.086) and resources (0.079). The risk sub-factors were also ranked and the top five sub-factors were determined as follows: flood (0.633), inflation risk (0.561), changes in government law and regulation (0.543), lack coordination between parties (0.467), fund risk (0.439). It is expected that the data presented in this study can be used to strategically select elements for risk monitoring on the prioritization risk.
first_indexed 2024-03-06T13:02:04Z
format Undergraduates Project Papers
id UMPir35876
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T13:02:04Z
publishDate 2019
record_format dspace
spelling UMPir358762023-11-23T08:00:35Z http://umpir.ump.edu.my/id/eprint/35876/ Risk assessment of public road construction projects using analytical hierarchy process (AHP) Putri Aifa Syuhaida, Shabuddin T Technology (General) TA Engineering (General). Civil engineering (General) Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of risk to occur which places the road construction project at risk of cost, time overruns and poor quality delivery. The aim of this study was to analyze the risk assessment of public road construction projects. The factors and sub-factors of risk in public road construction project were scrutinized from the literature review. The designate pair-wise questionnaire survey was distributed to the road engineering section of public work department, road contractors and road concessionaires in accordance with the Analytic Hierarchy Process (AHP). This study identified the most prioritized risk factors as follows: economic and financial (0.267), technical (0.165), organizational (0.148), contractual (0.130), natural hazard (0.125), socio and politic (0.086) and resources (0.079). The risk sub-factors were also ranked and the top five sub-factors were determined as follows: flood (0.633), inflation risk (0.561), changes in government law and regulation (0.543), lack coordination between parties (0.467), fund risk (0.439). It is expected that the data presented in this study can be used to strategically select elements for risk monitoring on the prioritization risk. 2019-05 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/35876/1/Risk%20assessment%20of%20public%20road%20construction%20projects%20using%20analytical%20hierarchy%20process%20%28AHP%29.pdf Putri Aifa Syuhaida, Shabuddin (2019) Risk assessment of public road construction projects using analytical hierarchy process (AHP). Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Putri Aifa Syuhaida, Shabuddin
Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title_full Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title_fullStr Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title_full_unstemmed Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title_short Risk assessment of public road construction projects using analytical hierarchy process (AHP)
title_sort risk assessment of public road construction projects using analytical hierarchy process ahp
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/35876/1/Risk%20assessment%20of%20public%20road%20construction%20projects%20using%20analytical%20hierarchy%20process%20%28AHP%29.pdf
work_keys_str_mv AT putriaifasyuhaidashabuddin riskassessmentofpublicroadconstructionprojectsusinganalyticalhierarchyprocessahp