Developing safety aptitude measurement tool for contract workers during turnaround operation in petrochemical plants in Gebeng
Turnaround is the most significant inspection and maintenance event which takes place in the lifecycle of production unit at a plant. In conducting inspection, more than 70% of the expenditure is incurred during a turnaround. During this period, it involves peak contract staffing around 3000 to 5000...
Main Authors: | Abdul Wahab, Muhammad Nubli, Kassim, Hafizoah, Abdul Aziz, Nawawi |
---|---|
Format: | Research Report |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/36514/1/Developing%20safety%20aptitude%20measurement%20tool%20for%20contract%20workers%20during%20turnaround%20operation%20in%20petrochemical%20plants%20in%20Gebeng.wm.pdf |
Similar Items
-
Potential of Aquatic Plant as Phytoremediator for Treatment of Petrochemical Wastewater in Gebeng Area, Kuantan
by: Abdul Syukor, Abd Razak, et al.
Published: (2013) -
Developing strategic syura tool to enhance effectiveness of meeting
by: Abdul Wahab, Muhammad Nubli, et al.
Published: (2007) -
Managing the safety of contingent workers : a study of contract workers in the petrochemical industry
Published: (2003) -
The study of fire safety status and
awareness among workers at Utilities
Gebeng
by: Roslan, Wan Hazwani Wan Mohammad
Published: (2014) -
Characteristics of Occupational Exposure to Benzene during Turnaround in the Petrochemical Industries
by: Eun-Kyo Chung, et al.
Published: (2010-09-01)