Implementing time-driven activity-based costing for unused capacity measurement in local university

All university departments must maximize their use of time and resources in order to meet their goal with the least amount of waste. The existing system in a local university does not implement the time equation and so the processing time determined is not in accordance with the actual processing ti...

Full description

Bibliographic Details
Main Authors: Sri Nur Areena, Mohd Zaini, Mohd Yazid, Abu
Format: Article
Language:English
Published: MDPI 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/37070/1/publication2-RDU220108.pdf
_version_ 1796995611930656768
author Sri Nur Areena, Mohd Zaini
Mohd Yazid, Abu
author_facet Sri Nur Areena, Mohd Zaini
Mohd Yazid, Abu
author_sort Sri Nur Areena, Mohd Zaini
collection UMP
description All university departments must maximize their use of time and resources in order to meet their goal with the least amount of waste. The existing system in a local university does not implement the time equation and so the processing time determined is not in accordance with the actual processing time of every activity. Thus, the present implementation in the organization does not illustrate the correlation between the supplied resources and the practical capacity. The purpose of this study was to build a new costing structure using time-driven activity-based costing for academic staff. This work considered annual Key Performance Indicator Analysis data for the year 2020 with 53 sub parameters; this was from an engineering faculty for lecturers in two different grades with 12 and 27 samples, respectively. Eventually, there were 3 and 16 samples in grade DS45 and DS51/52, respectively, that have an insufficient time capacity. The remaining samples in both grades then had an unused time capacity, which ultimately resulted in unused cost capacity, also known as waste cost. This work was able to discover the total amount of used time that results in used, unused, or otherwise insufficient capacity, after analyzing the capacity cost using Time-Driven Activity- Based Costing.
first_indexed 2024-03-06T13:04:55Z
format Article
id UMPir37070
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T13:04:55Z
publishDate 2023
publisher MDPI
record_format dspace
spelling UMPir370702023-03-09T03:29:56Z http://umpir.ump.edu.my/id/eprint/37070/ Implementing time-driven activity-based costing for unused capacity measurement in local university Sri Nur Areena, Mohd Zaini Mohd Yazid, Abu TS Manufactures All university departments must maximize their use of time and resources in order to meet their goal with the least amount of waste. The existing system in a local university does not implement the time equation and so the processing time determined is not in accordance with the actual processing time of every activity. Thus, the present implementation in the organization does not illustrate the correlation between the supplied resources and the practical capacity. The purpose of this study was to build a new costing structure using time-driven activity-based costing for academic staff. This work considered annual Key Performance Indicator Analysis data for the year 2020 with 53 sub parameters; this was from an engineering faculty for lecturers in two different grades with 12 and 27 samples, respectively. Eventually, there were 3 and 16 samples in grade DS45 and DS51/52, respectively, that have an insufficient time capacity. The remaining samples in both grades then had an unused time capacity, which ultimately resulted in unused cost capacity, also known as waste cost. This work was able to discover the total amount of used time that results in used, unused, or otherwise insufficient capacity, after analyzing the capacity cost using Time-Driven Activity- Based Costing. MDPI 2023-02-17 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/37070/1/publication2-RDU220108.pdf Sri Nur Areena, Mohd Zaini and Mohd Yazid, Abu (2023) Implementing time-driven activity-based costing for unused capacity measurement in local university. Sustainability, 15 (4). pp. 1-19. ISSN 2071-1050. (Published) https://doi.org/10.3390/ su15043756
spellingShingle TS Manufactures
Sri Nur Areena, Mohd Zaini
Mohd Yazid, Abu
Implementing time-driven activity-based costing for unused capacity measurement in local university
title Implementing time-driven activity-based costing for unused capacity measurement in local university
title_full Implementing time-driven activity-based costing for unused capacity measurement in local university
title_fullStr Implementing time-driven activity-based costing for unused capacity measurement in local university
title_full_unstemmed Implementing time-driven activity-based costing for unused capacity measurement in local university
title_short Implementing time-driven activity-based costing for unused capacity measurement in local university
title_sort implementing time driven activity based costing for unused capacity measurement in local university
topic TS Manufactures
url http://umpir.ump.edu.my/id/eprint/37070/1/publication2-RDU220108.pdf
work_keys_str_mv AT srinurareenamohdzaini implementingtimedrivenactivitybasedcostingforunusedcapacitymeasurementinlocaluniversity
AT mohdyazidabu implementingtimedrivenactivitybasedcostingforunusedcapacitymeasurementinlocaluniversity