The Utilization of Solar Cell for Power Lighting Equipment on the Ferry

An electric motor become much more practical and economical having a multiplicity findings on the technology of solar panels, battery and charger better. An electric motor cost-effective care and in working. The installation of an electric motor more simple and does not need the cooler. All the need...

وصف كامل

التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Faturachman, Danny, Shariman, Mustafa, Muslim, Muswar
التنسيق: Conference or Workshop Item
اللغة:English
منشور في: 2013
الموضوعات:
الوصول للمادة أونلاين:http://umpir.ump.edu.my/id/eprint/3807/1/ftek-Danny_Utilization_of_Solar_2013.pdf
_version_ 1825821443517054976
author Faturachman, Danny
Shariman, Mustafa
Muslim, Muswar
author_facet Faturachman, Danny
Shariman, Mustafa
Muslim, Muswar
author_sort Faturachman, Danny
collection UMP
description An electric motor become much more practical and economical having a multiplicity findings on the technology of solar panels, battery and charger better. An electric motor cost-effective care and in working. The installation of an electric motor more simple and does not need the cooler. All the needs of electrical power in supply from batteries being replenished by solar panels. Solar power become one of alternative energy to overcome the presence of the energy crisis especially a reduction in the availability of petroleum and the more expensive world oil prices. Major problems focused on design of electric system as power plant resources in the ship. The main issues discussed on is as follows: 1. Did design system supply resources and also calculation to determine battery and solar panels to be used. 2. Determine the laying on systems equipment. In this research, taking and analyzing data obtained from the results of the field by using the existing theory and make use of data from the internet and literature data. In duty end of this analysis conducted by the use of solar power as the supply of equipment lighting on a ship ferry Ro-Ro 500 GRT. Based on calculations data ship obtained a number of 35 solar panels that is attached to supply 10 batteries power by producing 42000 VA. Power is used to meet the needs of illumination burden 33600 VA to the discharging time 12 hours (from 18.00 – 6.00). So that the installation of solar systems can save energy by 52.5 % of the generator burden.
first_indexed 2024-03-06T11:41:37Z
format Conference or Workshop Item
id UMPir3807
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T11:41:37Z
publishDate 2013
record_format dspace
spelling UMPir38072018-02-06T02:12:55Z http://umpir.ump.edu.my/id/eprint/3807/ The Utilization of Solar Cell for Power Lighting Equipment on the Ferry Faturachman, Danny Shariman, Mustafa Muslim, Muswar TK Electrical engineering. Electronics Nuclear engineering An electric motor become much more practical and economical having a multiplicity findings on the technology of solar panels, battery and charger better. An electric motor cost-effective care and in working. The installation of an electric motor more simple and does not need the cooler. All the needs of electrical power in supply from batteries being replenished by solar panels. Solar power become one of alternative energy to overcome the presence of the energy crisis especially a reduction in the availability of petroleum and the more expensive world oil prices. Major problems focused on design of electric system as power plant resources in the ship. The main issues discussed on is as follows: 1. Did design system supply resources and also calculation to determine battery and solar panels to be used. 2. Determine the laying on systems equipment. In this research, taking and analyzing data obtained from the results of the field by using the existing theory and make use of data from the internet and literature data. In duty end of this analysis conducted by the use of solar power as the supply of equipment lighting on a ship ferry Ro-Ro 500 GRT. Based on calculations data ship obtained a number of 35 solar panels that is attached to supply 10 batteries power by producing 42000 VA. Power is used to meet the needs of illumination burden 33600 VA to the discharging time 12 hours (from 18.00 – 6.00). So that the installation of solar systems can save energy by 52.5 % of the generator burden. 2013-07 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3807/1/ftek-Danny_Utilization_of_Solar_2013.pdf Faturachman, Danny and Shariman, Mustafa and Muslim, Muswar (2013) The Utilization of Solar Cell for Power Lighting Equipment on the Ferry. In: 6th International Engineering Conference (Encon): "Energy and Environment" 2013 , Hilton Kuching Hotel, Sarawak , 2-4 July 2013. . (Unpublished) (Unpublished)
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Faturachman, Danny
Shariman, Mustafa
Muslim, Muswar
The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title_full The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title_fullStr The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title_full_unstemmed The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title_short The Utilization of Solar Cell for Power Lighting Equipment on the Ferry
title_sort utilization of solar cell for power lighting equipment on the ferry
topic TK Electrical engineering. Electronics Nuclear engineering
url http://umpir.ump.edu.my/id/eprint/3807/1/ftek-Danny_Utilization_of_Solar_2013.pdf
work_keys_str_mv AT faturachmandanny theutilizationofsolarcellforpowerlightingequipmentontheferry
AT sharimanmustafa theutilizationofsolarcellforpowerlightingequipmentontheferry
AT muslimmuswar theutilizationofsolarcellforpowerlightingequipmentontheferry
AT faturachmandanny utilizationofsolarcellforpowerlightingequipmentontheferry
AT sharimanmustafa utilizationofsolarcellforpowerlightingequipmentontheferry
AT muslimmuswar utilizationofsolarcellforpowerlightingequipmentontheferry