A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects

The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the exten...

Full description

Bibliographic Details
Main Authors: Nur Nadhirah, Muhammuddin, Mohd Suhaimi, Mohd-Danuri, Mahanim, Hanid, Fadzida, Ismail, Mohd Nasrun, Mohd Nawi
Format: Article
Language:English
Published: Malaysian Institute Of Planners 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf
_version_ 1825815267997908992
author Nur Nadhirah, Muhammuddin
Mohd Suhaimi, Mohd-Danuri
Mahanim, Hanid
Fadzida, Ismail
Mohd Nasrun, Mohd Nawi
author_facet Nur Nadhirah, Muhammuddin
Mohd Suhaimi, Mohd-Danuri
Mahanim, Hanid
Fadzida, Ismail
Mohd Nasrun, Mohd Nawi
author_sort Nur Nadhirah, Muhammuddin
collection UMP
description The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contractors) in the Klang Valley area. This paper presents the PCA findings, which have led to the development of a framework to prevent disputes in different stages of building construction projects. The PCA findings have narrowed down the major contributors of disputes to “Contract-related causes” and “Time-related causes”. PCA analysis has also shown that the three key themes of “Quality-related strategies,” “Business relationship-related strategies,” and “Productivity-related strategies” were the most effective ways to reduce disagreements. It is important to highlight that the findings related to the causes of disputes during the planning stage consistently align with those of a prior study. This underscores the importance of ethical conduct, particularly during the planning phase and, more specifically, within the tendering process.
first_indexed 2024-03-06T13:10:58Z
format Article
id UMPir39281
institution Universiti Malaysia Pahang
language English
last_indexed 2024-03-06T13:10:58Z
publishDate 2023
publisher Malaysian Institute Of Planners
record_format dspace
spelling UMPir392812023-11-14T00:49:04Z http://umpir.ump.edu.my/id/eprint/39281/ A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects Nur Nadhirah, Muhammuddin Mohd Suhaimi, Mohd-Danuri Mahanim, Hanid Fadzida, Ismail Mohd Nasrun, Mohd Nawi HD28 Management. Industrial Management TH Building construction The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contractors) in the Klang Valley area. This paper presents the PCA findings, which have led to the development of a framework to prevent disputes in different stages of building construction projects. The PCA findings have narrowed down the major contributors of disputes to “Contract-related causes” and “Time-related causes”. PCA analysis has also shown that the three key themes of “Quality-related strategies,” “Business relationship-related strategies,” and “Productivity-related strategies” were the most effective ways to reduce disagreements. It is important to highlight that the findings related to the causes of disputes during the planning stage consistently align with those of a prior study. This underscores the importance of ethical conduct, particularly during the planning phase and, more specifically, within the tendering process. Malaysian Institute Of Planners 2023 Article PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf Nur Nadhirah, Muhammuddin and Mohd Suhaimi, Mohd-Danuri and Mahanim, Hanid and Fadzida, Ismail and Mohd Nasrun, Mohd Nawi (2023) A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects. Planning Malaysia: Journal of the Malaysian Institute of Planners, 21 (5). pp. 267-282. ISSN 0128-0945. (Published) https://doi.org/10.21837/pm.v21i29.1370 10.21837/pm.v21i29.1370
spellingShingle HD28 Management. Industrial Management
TH Building construction
Nur Nadhirah, Muhammuddin
Mohd Suhaimi, Mohd-Danuri
Mahanim, Hanid
Fadzida, Ismail
Mohd Nasrun, Mohd Nawi
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title_full A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title_fullStr A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title_full_unstemmed A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title_short A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
title_sort preliminary framework for preventing disputes in different stages of building construction projects
topic HD28 Management. Industrial Management
TH Building construction
url http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf
work_keys_str_mv AT nurnadhirahmuhammuddin apreliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mohdsuhaimimohddanuri apreliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mahanimhanid apreliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT fadzidaismail apreliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mohdnasrunmohdnawi apreliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT nurnadhirahmuhammuddin preliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mohdsuhaimimohddanuri preliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mahanimhanid preliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT fadzidaismail preliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects
AT mohdnasrunmohdnawi preliminaryframeworkforpreventingdisputesindifferentstagesofbuildingconstructionprojects