Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine

Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in the global competition. A smooth p...

Full description

Bibliographic Details
Main Author: Aina Nadia Aida, Mohd Latif
Format: Undergraduates Project Papers
Language:English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/42553/1/AINA%20NADIA%20AIDA%20BINTI%20MOHD%20LATIF%20%5Bedited%5D.pdf
_version_ 1825815901359833088
author Aina Nadia Aida, Mohd Latif
author_facet Aina Nadia Aida, Mohd Latif
author_sort Aina Nadia Aida, Mohd Latif
collection UMP
description Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in the global competition. A smooth production operation and lower downtime in production shows that the plant is in better management and maintenance. This research is proposed to eliminate waste in setting up CNC winding machine using lean techniques and subsequently improve the availability rate of OEE by reducing set up time. This research has conducted at BI Technologies Corporation production area which is at CNC winding area. By using overall equipment effectiveness as a tool, it is used to evaluate how effectively a manufacturing operation is utilized. The element of OEE which is availability, quality and performance. By propose a solution to company which is toimprove current SOP and using control chart to investigate the OEE data. Ishikawadiagram also apply to show the root cause from investigation the chart from variation. At the end, the control chart used again to indicate the improvement at CNC winding area. The improvement of downtime will lower down the losses of company, and have higher availability with degree of utilization of the resources available. This paper reports the results of this research, including the results of an industrial implementation.
first_indexed 2024-09-25T03:52:56Z
format Undergraduates Project Papers
id UMPir42553
institution Universiti Malaysia Pahang
language English
last_indexed 2024-09-25T03:52:56Z
publishDate 2015
record_format dspace
spelling UMPir425532024-09-10T04:07:55Z http://umpir.ump.edu.my/id/eprint/42553/ Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine Aina Nadia Aida, Mohd Latif TA Engineering (General). Civil engineering (General) TS Manufactures Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in the global competition. A smooth production operation and lower downtime in production shows that the plant is in better management and maintenance. This research is proposed to eliminate waste in setting up CNC winding machine using lean techniques and subsequently improve the availability rate of OEE by reducing set up time. This research has conducted at BI Technologies Corporation production area which is at CNC winding area. By using overall equipment effectiveness as a tool, it is used to evaluate how effectively a manufacturing operation is utilized. The element of OEE which is availability, quality and performance. By propose a solution to company which is toimprove current SOP and using control chart to investigate the OEE data. Ishikawadiagram also apply to show the root cause from investigation the chart from variation. At the end, the control chart used again to indicate the improvement at CNC winding area. The improvement of downtime will lower down the losses of company, and have higher availability with degree of utilization of the resources available. This paper reports the results of this research, including the results of an industrial implementation. 2015-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/42553/1/AINA%20NADIA%20AIDA%20BINTI%20MOHD%20LATIF%20%5Bedited%5D.pdf Aina Nadia Aida, Mohd Latif (2015) Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang Al-Sultan Abdullah.
spellingShingle TA Engineering (General). Civil engineering (General)
TS Manufactures
Aina Nadia Aida, Mohd Latif
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title_full Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title_fullStr Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title_full_unstemmed Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title_short Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
title_sort improvement of availability rate of overall equipment effectiveness oee for cnc winding machine
topic TA Engineering (General). Civil engineering (General)
TS Manufactures
url http://umpir.ump.edu.my/id/eprint/42553/1/AINA%20NADIA%20AIDA%20BINTI%20MOHD%20LATIF%20%5Bedited%5D.pdf
work_keys_str_mv AT ainanadiaaidamohdlatif improvementofavailabilityrateofoverallequipmenteffectivenessoeeforcncwindingmachine