Developments of 2 Inches Loop Pipelines for Paraffin Deposition Testing Facility Using Plant Design Management System (PDMS)
The main frontier of exploring the deepwater ocean bed is due to the risk of paraffin deposition to the pipe. Going further offshore, the risk is increases because of the increasing of the length of pipelines and decreasing of the temperature. Paraffin will start to deposit along the pipeline once t...
Main Author: | Azni Yusra, Ahmad Kasmiri |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/7190/1/Developments%20of%202%20inches%20loop%20pipelines%20for%20paraffin%20deposition%20testing%20facility%20using%20plant%20design%20management%20system%20%28PDMS%29.pdf |
Similar Items
-
Managing paraffin wax deposition in oilwell
by: Abdul Kadir, Abdul Aziz, et al.
Published: (1999) -
Removal of paraffin deposition using yeast
by: Radzali, Suria Riza
Published: (2007) -
Flow Study on Medium Size Pipeline Testing Loop
by: Tan Ni, King
Published: (2013) -
Paraffin wax deposition and its remediation methods on crude oil pipelines: A systematic review
by: Elarbe, Basem, et al.
Published: (2021) -
Newton loop method in gas pipeline network
by: Gindalan, Emma Olga Taimin
Published: (2010)