Improving development profit by using reservoir based completion
Implementation of well completions enabling multiple hydrocarbon reservoirs to be produced by a single well can save production cost and enhance recovery. Aiming at the characteristics of the three types of oil and gas reservoirs in the Jabung block in Indonesia, namely, gas cap oil-rim reservoirs,...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2008-08-01
|
Series: | Petroleum Exploration and Development |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1876380408600981 |
_version_ | 1818420522103341056 |
---|---|
author | Xiao-guang LÜ Xue-wen ZHANG Yong-xi LIU Bradford W Sincock Budi Tyas Utomo |
author_facet | Xiao-guang LÜ Xue-wen ZHANG Yong-xi LIU Bradford W Sincock Budi Tyas Utomo |
author_sort | Xiao-guang LÜ |
collection | DOAJ |
description | Implementation of well completions enabling multiple hydrocarbon reservoirs to be produced by a single well can save production cost and enhance recovery. Aiming at the characteristics of the three types of oil and gas reservoirs in the Jabung block in Indonesia, namely, gas cap oil-rim reservoirs, multiple hydrocarbon reservoirs, and heterogeneous multiple-sand reservoirs, this article puts forward optimized completion methods by using conventional technology and down-hole equipment. The new methods are able to develop multireservoir sands at the same time or successively without additional completion jobs. In addition, the novel completion enables water injection wells to selectively control injection and improve the recovery of hydrocarbons. The above strategies have been applied to different types of reservoirs, providing an effective mean for maximizing hydrocarbon recovery, controlling operating expenditures, and improving the overall benefit of development wells. Key words: one time completion, reservoir characteristics, optimized completion, downhole operation, overall benefit |
first_indexed | 2024-12-14T12:55:48Z |
format | Article |
id | doaj.art-00020f6f2be54ae4ae4c34134a9f6506 |
institution | Directory Open Access Journal |
issn | 1876-3804 |
language | English |
last_indexed | 2024-12-14T12:55:48Z |
publishDate | 2008-08-01 |
publisher | KeAi Communications Co., Ltd. |
record_format | Article |
series | Petroleum Exploration and Development |
spelling | doaj.art-00020f6f2be54ae4ae4c34134a9f65062022-12-21T23:00:33ZengKeAi Communications Co., Ltd.Petroleum Exploration and Development1876-38042008-08-01354509512Improving development profit by using reservoir based completionXiao-guang LÜ0Xue-wen ZHANG1Yong-xi LIU2Bradford W Sincock3Budi Tyas Utomo4CNODC Indonesia Project, Jakarta, Indonesia 12930; Corresponding authorCNODC Indonesia Project, Jakarta, Indonesia 12930Research Institute of Production Engineering, Petrochina Daqing Oilfield Limited Company, Daqing 163453, ChinaCNODC Indonesia Project, Jakarta, Indonesia 12930CNODC Indonesia Project, Jakarta, Indonesia 12930Implementation of well completions enabling multiple hydrocarbon reservoirs to be produced by a single well can save production cost and enhance recovery. Aiming at the characteristics of the three types of oil and gas reservoirs in the Jabung block in Indonesia, namely, gas cap oil-rim reservoirs, multiple hydrocarbon reservoirs, and heterogeneous multiple-sand reservoirs, this article puts forward optimized completion methods by using conventional technology and down-hole equipment. The new methods are able to develop multireservoir sands at the same time or successively without additional completion jobs. In addition, the novel completion enables water injection wells to selectively control injection and improve the recovery of hydrocarbons. The above strategies have been applied to different types of reservoirs, providing an effective mean for maximizing hydrocarbon recovery, controlling operating expenditures, and improving the overall benefit of development wells. Key words: one time completion, reservoir characteristics, optimized completion, downhole operation, overall benefithttp://www.sciencedirect.com/science/article/pii/S1876380408600981 |
spellingShingle | Xiao-guang LÜ Xue-wen ZHANG Yong-xi LIU Bradford W Sincock Budi Tyas Utomo Improving development profit by using reservoir based completion Petroleum Exploration and Development |
title | Improving development profit by using reservoir based completion |
title_full | Improving development profit by using reservoir based completion |
title_fullStr | Improving development profit by using reservoir based completion |
title_full_unstemmed | Improving development profit by using reservoir based completion |
title_short | Improving development profit by using reservoir based completion |
title_sort | improving development profit by using reservoir based completion |
url | http://www.sciencedirect.com/science/article/pii/S1876380408600981 |
work_keys_str_mv | AT xiaoguanglu improvingdevelopmentprofitbyusingreservoirbasedcompletion AT xuewenzhang improvingdevelopmentprofitbyusingreservoirbasedcompletion AT yongxiliu improvingdevelopmentprofitbyusingreservoirbasedcompletion AT bradfordwsincock improvingdevelopmentprofitbyusingreservoirbasedcompletion AT budityasutomo improvingdevelopmentprofitbyusingreservoirbasedcompletion |