An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization...

Full description

Bibliographic Details
Main Authors: Parham Azimi, Naeim Azouji
Format: Article
Language:English
Published: Iran University of Science & Technology 2017-11-01
Series:International Journal of Industrial Engineering and Production Research
Subjects:
Online Access:http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-630-2&slc_lang=en&sid=1
_version_ 1811279333165105152
author Parham Azimi
Naeim Azouji
author_facet Parham Azimi
Naeim Azouji
author_sort Parham Azimi
collection DOAJ
description In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current research. In this approach, the mathematical model of the main problem is relaxed and solved then the optimum solutions were used in the corresponding simulation model to produce several random feasible solutions for the main problem. Finally, the most promising solutions were selected as the initial population of a genetic Algorithm (GA). To test the efficiency of the problem, several test problems were solved by the proposed approach and according to the results, the proposed concept has a very good performance to solve such a complex combinatoral problem. Also, the concept could be easily applied for other similar combinatorics. 
first_indexed 2024-04-13T00:52:44Z
format Article
id doaj.art-0009ce24e5a24dcdae8a879c55e9a6b9
institution Directory Open Access Journal
issn 2008-4889
2345-363X
language English
last_indexed 2024-04-13T00:52:44Z
publishDate 2017-11-01
publisher Iran University of Science & Technology
record_format Article
series International Journal of Industrial Engineering and Production Research
spelling doaj.art-0009ce24e5a24dcdae8a879c55e9a6b92022-12-22T03:09:50ZengIran University of Science & TechnologyInternational Journal of Industrial Engineering and Production Research2008-48892345-363X2017-11-01284429439An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemsParham Azimi0Naeim Azouji1 Qazvin Islamic Azad University Qazvin Islamic Azad University In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current research. In this approach, the mathematical model of the main problem is relaxed and solved then the optimum solutions were used in the corresponding simulation model to produce several random feasible solutions for the main problem. Finally, the most promising solutions were selected as the initial population of a genetic Algorithm (GA). To test the efficiency of the problem, several test problems were solved by the proposed approach and according to the results, the proposed concept has a very good performance to solve such a complex combinatoral problem. Also, the concept could be easily applied for other similar combinatorics. http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-630-2&slc_lang=en&sid=1Optimization via Simulation Multi-mode Resource Constraint Project Scheduling Problem Genetic Algorithm
spellingShingle Parham Azimi
Naeim Azouji
An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
International Journal of Industrial Engineering and Production Research
Optimization via Simulation
Multi-mode Resource Constraint Project Scheduling Problem
Genetic Algorithm
title An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
title_full An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
title_fullStr An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
title_full_unstemmed An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
title_short An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
title_sort optimization via simulation approach for the preemptive and non preemptive multi mode resource constrained project scheduling problems
topic Optimization via Simulation
Multi-mode Resource Constraint Project Scheduling Problem
Genetic Algorithm
url http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-630-2&slc_lang=en&sid=1
work_keys_str_mv AT parhamazimi anoptimizationviasimulationapproachforthepreemptiveandnonpreemptivemultimoderesourceconstrainedprojectschedulingproblems
AT naeimazouji anoptimizationviasimulationapproachforthepreemptiveandnonpreemptivemultimoderesourceconstrainedprojectschedulingproblems
AT parhamazimi optimizationviasimulationapproachforthepreemptiveandnonpreemptivemultimoderesourceconstrainedprojectschedulingproblems
AT naeimazouji optimizationviasimulationapproachforthepreemptiveandnonpreemptivemultimoderesourceconstrainedprojectschedulingproblems