THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE
As the main bus station in Bogor, West Java, Baranangsiang bus station is currently located in the crowded city centre, near many offices, campuses and department stores. There is a plan of Bogor’s Dinas Perhubungan Komunikasi dan Informasi (Diskominfo) to relocate the bus station to the new locatio...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Gadjah Mada
2015-02-01
|
Series: | Journal of the Civil Engineering Forum |
Online Access: | https://jurnal.ugm.ac.id/jcef/article/view/18923 |
_version_ | 1818557069285916672 |
---|---|
author | Tri Sudibyo Imam Muthohar |
author_facet | Tri Sudibyo Imam Muthohar |
author_sort | Tri Sudibyo |
collection | DOAJ |
description | As the main bus station in Bogor, West Java, Baranangsiang bus station is currently located in the crowded city centre, near many offices, campuses and department stores. There is a plan of Bogor’s Dinas Perhubungan Komunikasi dan Informasi (Diskominfo) to relocate the bus station to the new location in the Pangeran Sogiri Street in Tanah Baru area, near the newly built toll road, the Bogor Outer Ring Road (BORR).This research is conducted to analyze the traffic performance impact of the relocation plan of the bus station to the BORR network and the Pangeran Sogiri Street.
The traffic data is obtained from the field survey in the Baranangsiang bus station and the BORR network. Some other secondary data are obtained from the Dinas Lalu Lintas and Angkutan Jalan (DLLAJ) Bogor city. Based on the obtained data, a micro simulation model is built by using Aimsun traffic micro simulation program. The analysis is conducted in three traffic performance parameters; the traffic density, speed, and vehicles queue length.
With respect to the analysis result, the relocation causes a serious traffic problem to the BORR network and the P. Sogiri Street. To minimize the problem caused by the relocation, three scenarios are proposed and thus simulated based on the findings and observed traffic problems. The first proposed scenario is conducted by widening the P. Sogiri Street and providing a 4-4 toll payment gate system to the BORR. This first scenario is able to reduce traffic problem in some sections, but the average network density, speed and queue length are still high by 132%, -54%, and 200% respectively compared to the existing condition. The second scenario is conducted by widening the P. Sogiri Street and providing a 5-3 toll gate system. This second scenario is also able to reduce traffic problem in most sections, but the average network density, speed and queue length are still high by 248%, -70%, and 95% respectively compared to the main bus station before the relocation. The third scenario is conducted by widening the P. Sogiri into 4 lanes, providing a 4-3 toll gate system, and providing a new access from/to P. Sogiri Street to Bogor city direction. The simulation result shows that the third scenario is considered as the best scenario since in this scenario, the density, speed and queue length are relatively similar compared to the existing condition. |
first_indexed | 2024-12-13T23:55:12Z |
format | Article |
id | doaj.art-00494c9619b04211910e378a9a943e92 |
institution | Directory Open Access Journal |
issn | 2089-5631 2549-5925 |
language | English |
last_indexed | 2024-12-13T23:55:12Z |
publishDate | 2015-02-01 |
publisher | Universitas Gadjah Mada |
record_format | Article |
series | Journal of the Civil Engineering Forum |
spelling | doaj.art-00494c9619b04211910e378a9a943e922022-12-21T23:26:35ZengUniversitas Gadjah MadaJournal of the Civil Engineering Forum2089-56312549-59252015-02-0121310.22146/jcef.1892312637THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCETri Sudibyo0Imam Muthohar1Graduate Student of Master Programme on Transport System and Engineering, Gadjah Mada UniversityDepartment of Civil and Environmental Engineering, Universitas Gadjah MadaAs the main bus station in Bogor, West Java, Baranangsiang bus station is currently located in the crowded city centre, near many offices, campuses and department stores. There is a plan of Bogor’s Dinas Perhubungan Komunikasi dan Informasi (Diskominfo) to relocate the bus station to the new location in the Pangeran Sogiri Street in Tanah Baru area, near the newly built toll road, the Bogor Outer Ring Road (BORR).This research is conducted to analyze the traffic performance impact of the relocation plan of the bus station to the BORR network and the Pangeran Sogiri Street. The traffic data is obtained from the field survey in the Baranangsiang bus station and the BORR network. Some other secondary data are obtained from the Dinas Lalu Lintas and Angkutan Jalan (DLLAJ) Bogor city. Based on the obtained data, a micro simulation model is built by using Aimsun traffic micro simulation program. The analysis is conducted in three traffic performance parameters; the traffic density, speed, and vehicles queue length. With respect to the analysis result, the relocation causes a serious traffic problem to the BORR network and the P. Sogiri Street. To minimize the problem caused by the relocation, three scenarios are proposed and thus simulated based on the findings and observed traffic problems. The first proposed scenario is conducted by widening the P. Sogiri Street and providing a 4-4 toll payment gate system to the BORR. This first scenario is able to reduce traffic problem in some sections, but the average network density, speed and queue length are still high by 132%, -54%, and 200% respectively compared to the existing condition. The second scenario is conducted by widening the P. Sogiri Street and providing a 5-3 toll gate system. This second scenario is also able to reduce traffic problem in most sections, but the average network density, speed and queue length are still high by 248%, -70%, and 95% respectively compared to the main bus station before the relocation. The third scenario is conducted by widening the P. Sogiri into 4 lanes, providing a 4-3 toll gate system, and providing a new access from/to P. Sogiri Street to Bogor city direction. The simulation result shows that the third scenario is considered as the best scenario since in this scenario, the density, speed and queue length are relatively similar compared to the existing condition.https://jurnal.ugm.ac.id/jcef/article/view/18923 |
spellingShingle | Tri Sudibyo Imam Muthohar THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE Journal of the Civil Engineering Forum |
title | THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE |
title_full | THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE |
title_fullStr | THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE |
title_full_unstemmed | THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE |
title_short | THE BOGOR BUS STATION RELOCATION IMPACT ANALYSIS TO THE BOGOR OUTER RING ROAD (BORR) AND PANGERAN SOGIRI STREET PERFORMANCE |
title_sort | bogor bus station relocation impact analysis to the bogor outer ring road borr and pangeran sogiri street performance |
url | https://jurnal.ugm.ac.id/jcef/article/view/18923 |
work_keys_str_mv | AT trisudibyo thebogorbusstationrelocationimpactanalysistothebogorouterringroadborrandpangeransogiristreetperformance AT imammuthohar thebogorbusstationrelocationimpactanalysistothebogorouterringroadborrandpangeransogiristreetperformance AT trisudibyo bogorbusstationrelocationimpactanalysistothebogorouterringroadborrandpangeransogiristreetperformance AT imammuthohar bogorbusstationrelocationimpactanalysistothebogorouterringroadborrandpangeransogiristreetperformance |